CP1172827-State Gymnasium-Front Entry-Improvements
This project includes, but is not limited to, improvements to the front entry lobby, front checkout desk, and associated access control systems serving the east and west buildings of the State Gymnasium.
| 02/13/2025 08:01 PM UTC |
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 02/20/2025 08:01 PM UTC |
CP1044573-Lloyd Veterinary Medical Center-Large Animal Ward 3-Expansion
This project will add 22,043 square feet of space to the existing facility. The project includes four building extensions and one free-standing structure. The additions are enhanced reproduction, critical care, horse rehabilitation, theriogenology, and a free-standing feeding and bedding facility. The new building will comprise of modest demolition of the existing wards and large animal hospital, as well as the construction of three expansions and infill between wards one and two, using materials and structures that are compatible with the current facilities. To support the additions, new services such as plumbing, HVAC, electrical power, lighting, fire protection, telecommunications, and security will be implemented. The present hospital and wards will continue to operate during the construction period, and any disruptions to services, deliveries, and daily operations must be managed with the ISU construction manager and the College of Veterinary Medicine Staff.
| 02/20/2025 08:01 PM UTC |
CP1004288-CYTown-Parking and Infrastructure Improvements-Parking Lot B5
The project consists of, but is not limited to, construction of parking lot B5 including storm sewer, subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
| 02/27/2025 08:01 PM UTC |
Number | Deadline |
---|---|
CP1159926-Maple Willow Larch Commons-Seasons Marketplace-Remodel-Venues
This phased project will update the front-of-house food service venues, circulation areas, and main entrance of the Seasons Marketplace at Maple Willow Larch Commons. Renovations include updating food service venue lines, food service equipment, and dining spaces. Work also includes associated modifications to mechanical, electrical, plumbing, and communications systems to accommodate food service venue upgrades.
| 01/16/2025 08:01 PM UTC |
CP965415-Scheman Building-Freight Elevators-Improvements
This project will upgrade the freight elevators in the Scheman Building. The scope of work includes, but is not limited to replacement of the doors, controllers, and door operating equipment in accordance with current code requirements.
| 01/16/2025 08:01 PM UTC |
CP1187632-Howe Hall-Roof Replacement-Section M
This project will remove the existing roof system down to the deck and replace with a new roofing system. The scope of work includes, but is not limited to, an EPDM (ethylene propylene diene monomer rubber) system designed for a minimum life expectancy of 25 years; new roof insulation to meet current energy codes; and roof access improvements to meet university standards
| 01/14/2025 08:01 PM UTC |
CP1146935-Utilities-Switchgear Vault 24 and 25-Replacement
This project replaces two high-voltage electrical Switches, 24 and 25, with new switches near Estes Hall and Carver Hall, respectively. The new Switch 24 will be located at an above-ground pad north of Estes Hall. The new Switch 25 will be located in a new underground vault west of the existing vault. In both cases, the existing vaults will remain, repurposed to aid future cable installations. New underground conduit will also be added to each of the new vaults, and a new high-voltage cable will be installed between Switch 25 and Estes Hall.
| 01/14/2025 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
CP1241528-Parks Library-Tiers-Lighting Replacement
This project includes, but is not limited to, replacement of ceiling-mounted light fixtures with new light fixtures and replacement of building wiring as indicated on the drawings.
| 12/17/2024 08:01 PM UTC |
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP1226581-Institutional Roads 2025-Stange Road-Reconstruction
Multiple road sections across campus have deteriorated and need full-depth concrete patching, asphalt patching, and mill and overlay work. This project includes, but is not limited to, repairs on Mortensen Road and Stange Road.
| 11/07/2024 08:01 PM UTC |
CP1232074-Black Engineering-Room 1056-Remodel
This project will remodel room 1056 in Black Engineering to remove obsolete equipment and install the air handler unit being removed from LeBaron Hall. The project includes, but is not limited to, new ductwork and electrical, a new exhaust fan, gas connections, a toxic gas cabinet, and refinishing the floor.
| 10/31/2024 07:01 PM UTC |