General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002595 - Helser Residence Hall-Tuckpointing
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
02/04/2020 08:01 PM UTC
CP002624-Insectary, Genetics Storage, and Chick Isolation-Demolition
The project consists of, but is not limited to, the demolition of the Insectary, Genetics Storage, and Chick Isolation buildings at Iowa State University. Work also includes utility abandonment, utility demolition, steam tunnel removal, pavement and sidewalk removals, excavation, grading, lighting and replacement of pavement and sidewalks.
01/23/2020 08:01 PM UTC
CP002536 - Molecular Biology Building-Rooms 0112 and 0114-Remodel
The project consists of, but is not limited to, the conversion of two existing wet laboratories into space for a new electron microscope. Work includes, but is not limited to, interior demolition of the existing laboratories and construction of new walls, door, and interior finishes. Additional work includes modification of the sprinkler and ventilation systems, and installation of new lighting and electrical connections for new equipment.
12/12/2019 08:01 PM UTC
CP002605 - University Compost Facility-Soil Storage Building
The project consists of, but is not limited to, materials and labor for the installation of a pre-engineered open sided steel building with concrete floor and aprons.
12/05/2019 08:01 PM UTC
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
11/21/2019 08:01 PM UTC
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.
11/19/2019 08:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
11/19/2019 08:01 PM UTC
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
291 - 300 of 409 Solicitations