General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
04/25/2019 07:01 PM UTC
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
04/23/2019 07:01 PM UTC
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.
04/11/2019 07:01 PM UTC
CP002560 - Parking Lot 85E-Resurfacing and Expansion
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project consists of, but is not limited to, clearing and grubbing, pavement removal, grading, intake replacement, storm sewer installation, subgrade preparation, curb & gutter, asphalt milling, HMA pavement, 5” PCC sidewalk, full-depth HMA patching, reinforced PCC stairs, pavement markings, parking lot light lighting , concrete encased duct bank, traffic control, surface restoration, construction survey, and miscellaneous associated work.
04/11/2019 07:01 PM UTC
CP002568-Catt Hall-Rooms 0202, 0207, 0237, and 0251-Remodel
The project consists of, but is not limited to, rework of existing construction and addition of new offices at four locations within the second floor of Catt Hall. Mechanical, electrical, plumbing, sprinkler and communication systems to be modified and/or extended for new spaces. Coordinate work with furniture by Owner.
04/04/2019 07:01 PM UTC
CP002439 - East of University Boulevard-Site Improvements-Recreation Services-Field Lighting
The project consists of, but is not limited to, athletic field lighting and installation, including lighting controls, poles and lighting fixtures.
04/02/2019 07:01 PM UTC
CP002505 - Sports Performance Center & Jack Trice Stadium Improvements North-Site Utilities
The project consists of, but is not limited to, removal and relocation of existing site utilities, and installation of new site utilities. Work includes storm and sanitary sewers, water, electrical, and information technologies.
03/28/2019 07:01 PM UTC
CP002564-Parks Library-Common Area Improvements
The project consists of, but is not limited to, relocation of the service desk and renovation of the commons area with new study rooms adjacent to the entry area. Work includes demolition of existing offices and floor finishes, and alterations of mechanical and electrical systems to support the renovation.
03/28/2019 07:01 PM UTC
CP002553 - Utilities-Switchgear Vault 39 Replacement
The project consists of, but is not limited to, construction of two underground cast-in-place electrical vaults, demolition of an existing electrical vault, installation of new electrical medium voltage cable, conduit, cable splices, and terminations, supporting and working around energized medium voltage cable and equipment, and installation of 600V conduit, wire, and ground boxes.
03/26/2019 07:01 PM UTC
CP002439 - East of University Boulevard-Site Improvements-Recreation Services
The project consists of, but is not limited to, the demolition of existing turf, softball infields, service building, utilities and athletic field accessories. Work in this project includes but is not limited to installation of athletic field turf, irrigation systems, electrical services and distribution, site grading domestic water service and distribution, sidewalks building foundations, masonry construction, roofing and athletic fencing.
03/21/2019 07:01 PM UTC
291 - 300 of 376 Solicitations
1 2 26 27 28 30 32 33 34 37 38