Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002528-BioCentury Research Farm - HST Building Roof Replacement
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to install a new structural retrofit roof sub-framing system, insulation, and new metal standing seam roof over an existing building roof.
07/19/2018 07:01 PM UTC
CP002485 - Department of Residence-Helser Residence Hall-Elevator Improvements
The project consists of, but is not limited to, modernization of the current freight elevator into a passenger elevator, construction of new elevator penthouse and mechanical room, and associated structural alterations for penetration of roof deck for new construction.
06/07/2018 07:01 PM UTC
CP002477 - Human Nutritional Sciences Building-AHU 1-Humidification System Replacement
The project consists of, but is not limited to, replacing the existing chilled water coil, replacing existing corroded ductwork, installing new humidification unit, and new electrical wiring for controls.
05/31/2018 07:01 PM UTC
CP002457 - Hub-Retail Dining Services Renovation
The project consists of, but is not limited to, renovation of the existing Hub’s interior. Renovation will include seating/dining area, back-of-house space, grille venue and coffee venue. The coffee venue will be relocated and separated from the grille.
05/10/2018 07:01 PM UTC
CP002387-Utilities-Lied Recreation Athletic Facility-Steam Supply Replacement-Gasket Replacement
The project consists of, but is not limited to, replacement of the existing coupling and gaskets that are a part of the joint and fitting assemblies on all existing grooved piping that is part of the heating water system.
05/08/2018 07:01 PM UTC
CP002055 - Biosciences Facilities-Advanced Teaching & Research Building-Zebra Fish Laboratory
The project consists of, but is not limited to, installation of new drywall partitions, continuation of the roughed in mechanical and electrical services. The installation of the following owner-furnished items: laboratory casework, doors and frames, fan coil units, lighting systems to complete this core support space in the basement of the new Advanced Teaching and Research Building.
04/26/2018 07:01 PM UTC
CP002401 - Armory-Window Replacement-Phase 2
The project consists of, but is not limited to, providing and installing new windows as indicated on construction documents and as required trim and sills.
04/12/2018 07:01 PM UTC
CP002479 - Music-AHU2 Humidification System Replacement
The project consists of, but is not limited to, replacing the existing supply air handling unit including: cooling/dehumidifying coil, heat/reheat coil, blower, and direct-injection humidifier. The project also includes electrical power for new humidifier and new AHU Johnson Controls.
04/10/2018 07:01 PM UTC
CP002458 - Union Drive Community Center-Clyde's Dining Renovation
The project consists of, but is not limited to, renovated seating/dining area, renovated serving stations, renovated back-of-house (BOH) space that includes foodservice kitchen and dry storage, new interior entrances with overhead coiling security grilles from adjacent building spaces, renovated vestibule, of an existing foodservice and dining facility in Union Drive Community Center.
03/29/2018 07:01 PM UTC
CP002418 - Memorial Union-Dining Services Central Space Remodel
The project consists of, but is not limited to, renovation of the central food court space located on the first floor of the Memorial Union. Scope includes a new food service salad bar, counters, POS stations and food service equipment. Finish upgrades to include new flooring tile, wall finishes, and an acoustic ceiling tile cloud. A new security grille will be installed at the main entry. The project includes limited scope within each of the five venues serving the food court. This includes replacement of existing acoustic ceiling tile and grid, minor painting, and patching of fiber reinforced plastic paneling. Scope of work also includes mechanical and electrical construction in adjacent areas to modify services to serve the space. Some services will be routed through excavated tunnels below.
03/27/2018 07:01 PM UTC