General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002583-Veterinary Medicine-Fish Tank Lobby
The project consists of, but is not limited to, terrazzo flooring replacement; mechanical and electrical modifications, and new finishes throughout.
03/24/2020 07:01 PM UTC
CP002584 - Veterinary Medicine-Classroom 2532-Expansion
The project consists of, but is not limited to, structural modifications; mechanical, electrical, and technology upgrades; and modernized finishes.
03/19/2020 07:01 PM UTC
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
03/17/2020 07:01 PM UTC
CP002638 - Jack Trice Stadium-Field Renovation
The project consists of, but is not limited to, removal and off-site hauling of existing root zone materials, finish grading, sod installation and irrigation system adjustments. Contractor shall provide all incidental materials and equipment to install to specifications the system shown in the construction documents.
03/12/2020 07:01 PM UTC
CP002645-Utilities-P Tunnel Chilled Water Main-Replacement
The project consists of, but is not limited to installation of new sections of 20” HDPE chilled water lines under Lincoln Way south of Larch Residence Hall by directional drilling, connection to existing 14” ductile iron lines, and removal and replacement of existing pavement in the small drive south of Larch Residence Hall.
03/10/2020 07:01 PM UTC
CP002505-Sports Performance Center and Jack Trice Stadium Improvements North-Jacobson and Concourse
The project consists of, but is not limited to, remodeling within the existing Jacobson Building, demolition of the existing Olsen Building, constructing a new concourse and connection bridge, and stadium hillside upgrades. Work includes concrete foundations, steel structure, precast concrete, metal wall panels, glazing, PVC roofing, CMU, metal stud framing, interior glazing, interior finishes, mechanical, and electrical systems.
03/05/2020 08:01 PM UTC
CP002483-Barton Residence Hall-Window Replacement
The project consists of, but is not limited to, the replacement of approximately 118 windows.
02/27/2020 08:01 PM UTC
CP002617 - Beyer Hall-Rooms 1312 and 1316-Renovation
The project consists of, but is not limited to, the demolition of two existing recreational squash court interiors and renovating the existing space into a recreational electronic sports and gaming computer lab.
02/20/2020 08:01 PM UTC
CP002606 - Agricultural Engineering & Agronomy Farm-Plant Pathology Machine Storage Building
The project consists of, but is not limited to, materials and labor to construct a 6000 square feet equipment storage building. The building will be post-frame construction with metal siding and roofing. The building will be uninsulated and have a rock floor.
02/13/2020 08:01 PM UTC
CP002538 - Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, flat seam metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
02/13/2020 08:01 PM UTC
281 - 290 of 409 Solicitations
1 2 25 26 27 29 31 32 33 40 41