General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002529 - Gilman Hall-Rooms 2659, 2701, and 2705 Remodel
The project consists of, but is not limited to, remodeling existing laboratories into office space.
11/08/2018 08:01 PM UTC
CP002488 - Birch-Welch-Roberts-Residence Halls-Window Replacement
This project consist of, but is not limited to, the installation of new aluminum windows throughout Birch, Welch, and Roberts Residence Halls to replace existing windows removed under a separate abatement contract, (exceptions noted in documents). New accessory items to the window installation are included as well as patch, repair, and painting of existing wall construction to facilitate installation of new window assemblies. Construction will be completed during the summer of 2019 only—see Construction Progress Schedule and substantial completion dates.
11/01/2018 07:01 PM UTC
CP002511 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 3
The project consists of, but is not limited to, the removal and replacement of fifty-five (55) fan coil units and accessories. Complete installation per each unit(s) in a single room to be completed in three (3) work days. Work involves installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
10/23/2018 07:01 PM UTC
CP002411 - Curtiss Hall-Second Floor Renovation
The Project consists of the alteration of public hallways and office areas on second floor of Curtiss Hall, including the addition of a single use restroom, lactation room, and custodian’s closet.
09/27/2018 07:01 PM UTC
CP002225 - Student Innovation Center-Issuance 5-Food Service Rebid
The project consists of, but is not limited to, a 138,973 sf new building, that includes a basement and four (4) floors above grade. Work includes food service equipment for a café and demonstration kitchen.
09/18/2018 07:01 PM UTC
CP002532 - Veterinary Medical Research Institute-Buildings 1-6 Condensate Returns Replacement
The project consists of, but is not limited to, installation of a new low-pressure condensate return system between buildings 1 through 6 at Veterinary Medical Research Institute (VMRI). Work includes abandonment or removal or existing condensate lines, installation of new condensate return piping between buildings, connection of new piping to existing service inside each building, and removal and replacement of concrete sidewalk as needed for installation.
09/13/2018 07:01 PM UTC
CP002423 - Utilities-Power Plant-Fire Alarm System Improvements
The project consists of, but is not limited to, furnish and install a new Addressable Fire Alarm System throughout the Power Plant including, misc. cutting and patching, patch painting, removal of existing fire alarm system, new fire alarm control panel, new master annunciators, new automatic detection devices, new audio/visual signals, new connections to existing wet-pipe deluge systems, wiring, conduit and other related electrical work.
08/30/2018 07:01 PM UTC
CP002528-BioCentury Research Farm - HST Building Roof Replacement & Interior Remodel-Interior Remodel
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include spray foam insulation, steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
08/28/2018 07:01 PM UTC
CP002491 - Bessey Hall-Roof Replacement-Sections A-C, F and H
The project consists of, but is not limited to, the removal and replacement of roof sections A, B, C, F, & H due to the continual and ongoing maintenance, re-engineering Sections A,B,C,F & H to alleviate roof leak issues, replacement of swamp cooler curb and all roofing material down to the roof deck, removal of all abandoned roof equipment, repair sections properly prior to roof replacement, and replacement of all flashings.
08/23/2018 07:01 PM UTC
CP002501-Communications Building-Second Floor Remodel-Iowa Public Radio
The project consists of, but is not limited to, remodeling existing offices and conference space, ceiling replacement, flooring installation, painting, lighting, doors and associated hardware, lighting upgrades, millwork, mechanical, electrical, plumbing, and access controls.
08/07/2018 07:01 PM UTC
281 - 290 of 343 Solicitations
1 2 25 26 27 29 31 32 33 34 35