Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
| 07/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
| 05/30/2019 07:01 PM UTC |
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
| 05/14/2019 07:01 PM UTC |
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
| 04/25/2019 07:01 PM UTC |
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
| 04/25/2019 07:01 PM UTC |
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
| 04/23/2019 07:01 PM UTC |
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.
| 04/11/2019 07:01 PM UTC |
CP002560 - Parking Lot 85E-Resurfacing and Expansion
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The project consists of, but is not limited to, clearing and grubbing, pavement removal, grading, intake replacement, storm sewer installation, subgrade preparation, curb & gutter, asphalt milling, HMA pavement, 5” PCC sidewalk, full-depth HMA patching, reinforced PCC stairs, pavement markings, parking lot light lighting , concrete encased duct bank, traffic control, surface restoration, construction survey, and miscellaneous associated work.
| 04/11/2019 07:01 PM UTC |
CP002568-Catt Hall-Rooms 0202, 0207, 0237, and 0251-Remodel
The project consists of, but is not limited to, rework of existing construction and addition of new offices at four locations within the second floor of Catt Hall. Mechanical, electrical, plumbing, sprinkler and communication systems to be modified and/or extended for new spaces. Coordinate work with furniture by Owner.
| 04/04/2019 07:01 PM UTC |
CP002439 - East of University Boulevard-Site Improvements-Recreation Services-Field Lighting
The project consists of, but is not limited to, athletic field lighting and installation, including lighting controls, poles and lighting fixtures.
| 04/02/2019 07:01 PM UTC |
CP002505 - Sports Performance Center & Jack Trice Stadium Improvements North-Site Utilities
The project consists of, but is not limited to, removal and relocation of existing site utilities, and installation of new site utilities. Work includes storm and sanitary sewers, water, electrical, and information technologies.
| 03/28/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.