Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
|
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
| 05/05/2026 07:01 PM UTC |
|
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
| 05/05/2026 07:01 PM UTC |
|
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
| 05/07/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002562 - Veterinary Medicine-Domestic Water Line Replacement-Phase 4
The project consists of, but is not limited to, the extensions to the domestic water service and additional piping to facilitate future domestic water line replacement work. Provide piping, valves, piping accessories, insulation, and other items required to complete the system.
| 07/11/2019 07:01 PM UTC |
|
CP002505 - Town Engineering Building-Roof Replacement and Strobic Extension
(NOTE: CORRECT CP NUMBER IS CP002550)
The project consists of, but is not limited to, tear-off of approximately 45,660 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90 mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping and laboratory vent piping. Mechanical work includes extension of the existing strobic exhaust duct, installation of piping, and final connections to existing laboratory hoods. Removal of any roof mounted equipment no longer necessary after the strobic connection is complete.
| 07/09/2019 07:01 PM UTC |
|
CP002553 - Utilities-Switchgear Vault 39 Replacement
The project consists of, but is not limited to, construction of one underground cast-in-place electrical vault, repair walls of an existing underground electrical vault, installation of new electrical medium voltage cable and conduit, supporting and working around energized medium voltage cable and equipment, and installation of 600V conduit, wire, and ground boxes.
| 06/25/2019 07:01 PM UTC |
|
CP002576 - College of Design-Common Area Enhancements
The project consists of, but is not limited to, the patching and painting of the five-story atrium and central stair of the College of Design, as well as cleaning of the atrium side of the faculty windows located on the south side of the atrium.
| 06/25/2019 07:01 PM UTC |
|
CP002505 - Sports Performance Center and Jack Trice Stadium Improvements North-Sports Performance Center
The project consists of, but is not limited to, new construction for a 4-story plus basement, 98,626 sf Sports Performance Center. New construction for a single-story plus mezzanine, 13,832 sf West Bergstrom addition. Remodeling to the existing Bergstrom Facility, 18,827 sf with associated utility, building systems, site, and landscape work. Work includes concrete foundations, drilled piers, steel structure, precast concrete, metal wall panels, glazed curtain walls, PVC roofing, metal roofing panels, CMU, metal stud framing, interior glazing, interior finishes, lockers, kitchen equipment, mechanical, and electrical systems.
| 06/20/2019 07:01 PM UTC |
|
CP002589 - Union Drive Community Center-Union Drive Marketplace Renovation
The project consists of, but is not limited to, interior renovations of the mezzanine dining space and a conference room at the Union Drive Community Center Building.
| 06/18/2019 07:01 PM UTC |
|
CP002533 - Meats Laboratory-Roof Replacement-Sections A-I
The project consists of, but is not limited to, tear-off of approximately 29,220 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low-slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90-mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping, and vent piping.
| 06/13/2019 07:01 PM UTC |
|
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
| 06/13/2019 07:01 PM UTC |
|
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
| 06/13/2019 07:01 PM UTC |
|
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
| 06/06/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.