CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
09/05/2019 07:01 PM UTC
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
09/05/2019 07:01 PM UTC
CP002585 - National Swine Research and Information Center-Sprinkler System Modifications
The project consists of, but is not limited to, replacing all standard response sprinkler heads with quick response sprinkler heads, upsizing the cross mains, and modifying the main service.
08/27/2019 07:01 PM UTC
CP002551 - Lagomarcino Hall-Southwest Wing-Remodel
The project consists of, but is not limited to, space reconfiguration, new lighting, finish modernization, and minor HVAC modifications.
08/01/2019 07:01 PM UTC
CP002440 - Utilities-Applied Science 1-Electrical Service Replacement
The project consists of, but is not limited to, installing a new secondary 480 volt electrical service from an exterior padmount City of Ames transformer to interior room in building basement, boring a 4” PVC conduit to overhead power pole, installing new service entrance main breaker switchboard, and refeeding the existing 1600A main-tie-main switchboard. Project also includes electrical grounding work, existing pipe demolition in basement mechanical room, new utility metering, transformer concrete pad installation, and provide new light fixtures.
08/01/2019 07:01 PM UTC
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
07/30/2019 07:01 PM UTC
CP002540 - Veterinary Medicine-Field Services Building-Expansion
The project consists of, but is not limited to, the construction of a new building addition including foundations, building shell, interior finishes, doors, HVAC, and utilities on the north side of the existing Field Services Building. Also included is some interior renovation including restrooms.
07/25/2019 07:01 PM UTC
CP002214 - Agricultural Engineering & Agronomy Farm-Vehicle Dynamometer Facility
The project consists of, but is not limited to, the construction of a new building including foundations, building shell, equipment pit, doors, electrical service entrance to house a vehicle dynamometer.
07/11/2019 07:01 PM UTC
CP002562 - Veterinary Medicine-Domestic Water Line Replacement-Phase 4
The project consists of, but is not limited to, the extensions to the domestic water service and additional piping to facilitate future domestic water line replacement work. Provide piping, valves, piping accessories, insulation, and other items required to complete the system.
07/11/2019 07:01 PM UTC
CP002505 - Town Engineering Building-Roof Replacement and Strobic Extension
(NOTE: CORRECT CP NUMBER IS CP002550) The project consists of, but is not limited to, tear-off of approximately 45,660 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90 mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping and laboratory vent piping. Mechanical work includes extension of the existing strobic exhaust duct, installation of piping, and final connections to existing laboratory hoods. Removal of any roof mounted equipment no longer necessary after the strobic connection is complete.
07/09/2019 07:01 PM UTC