General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316832-Veenker Golf Course Grounds-Bridge Number 15 Replacement
This project will replace the existing bridge at Hole 15 of Veenker Golf Course. The scope of work includes, but is not limited to, the construction of a new, Pre-Engineered Steel Truss Recreational trail bridge and connecting cart paths. The new bridge will be located just south of the existing bridge. The existing bridge and portions of the cart path will be removed in their entirety.
10/13/2026 07:01 PM UTC
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
10/22/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
10/29/2026 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002536 - Molecular Biology Building-Rooms 0112 and 0114-Remodel
The project consists of, but is not limited to, the conversion of two existing wet laboratories into space for a new electron microscope. Work includes, but is not limited to, interior demolition of the existing laboratories and construction of new walls, door, and interior finishes. Additional work includes modification of the sprinkler and ventilation systems, and installation of new lighting and electrical connections for new equipment.
12/12/2019 08:01 PM UTC
CP002605 - University Compost Facility-Soil Storage Building
The project consists of, but is not limited to, materials and labor for the installation of a pre-engineered open sided steel building with concrete floor and aprons.
12/05/2019 08:01 PM UTC
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
11/21/2019 08:01 PM UTC
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.
11/19/2019 08:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
11/19/2019 08:01 PM UTC
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
10/17/2019 07:01 PM UTC
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
10/03/2019 07:01 PM UTC
301 - 310 of 417 Solicitations
1 2 … 27 28 29 31 33 34 35 … 41 42