CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002446 - Zaffarano Physics Addition-Exterior Repairs
The project consists of, but is not limited to:
1. Cleaning of existing precast and masonry.
2. Removal of all existing sealant and backer rods.
3. Patch precast concrete panels.
4. Masonry tuckpointing.
5. Install new sealant and backer systems.
6. Repair soffits.
| 03/22/2018 07:01 PM UTC |
CP002475 - Utilities-South Campus-No. 1 Feeder Replacement
The project consists of, but is not limited to, installing new 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations on above ground switchgear and transformer. Perform hi-pot cable tests on installed cable, splices, and terminations. De-energize and remove existing abandoned cable after new cable is installed.
| 03/15/2018 07:01 PM UTC |
CP002422 - Hilton Coliseum Parking Expansion
The project consists of, but is not limited to, removal of existing HMA and PCC pavement, new HMA pavement with PCC curb and gutter and reclaimed HMA base, PCC sidewalks, storm sewer structures and piping, bioswale, parking lot and sidewalk lighting as well as upgrades to the lighting distribution system, telecom panel and raceway for TV truck connections on site, wayfinding and parking stall signage, gate installation, pavement markings and finish grading/topsoil.
| 03/13/2018 07:01 PM UTC |
CP002404 - Parking Lot 96-Expansion
The project consists of, but is not limited to, sidewalk removal, street lights removal/replacement, pedestrian lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, electric vault lid replacement, storm sewer intakes, storm sewer piping, PCC sidewalk, PCC curb and gutter, HMA parking lot paving, traffic control and other associated work for a parking lot expansion project on the west side of the Veterinary Medicine campus at Iowa State University in Ames, Iowa.
| 03/08/2018 08:01 PM UTC |
CP002379-Parks Library-Restroom Renovations
The project consists of, but is not limited to, renovation of existing restroom facilities within the 1960’s portion of Parks Library. Renovation includes two (2) stacks of restrooms, with restrooms located on four floors. New restrooms will be inserted into locations on First and Fourth floors which are not currently restrooms. Project also includes reconfiguration of underground sanitary sewer, connection of piping to new owner furnished water heater, and tie-in of existing water softener to new water heater.
| 03/06/2018 08:01 PM UTC |
CP002363 - Reiman Gardens-Southwest Corner Improvements-Landscaping
The project consists of, but is not limited to, construction of plant gardens, connecting paths, water features, a single restroom building with mechanical space, a 40’ tall steel and wood tower, and associated earth work and utility services.
| 03/01/2018 08:01 PM UTC |
CP002385 - Maple-Willow-Larch Recreation Fields Improvements-Irrigation and Turf
The project consists of, but is not limited to, installation of athletic field irrigation system, removal of existing field organic material, installation and establishment of new natural turf.
| 02/22/2018 08:01 PM UTC |
CP002447 - Hamilton Hall-Window Replacement-Phase 2
The project consists of, but is not limited to, furnish and install new aluminum window system at areas indicated. Windows will be removed and disposed of by Owner’s abatement contractor. Coordinate removal of existing window assemblies and installation of new windows with Owner’s abatement contractor. Remove and reinstall existing window shades/blinds. Patch and paint adjacent walls as needed due to window replacement.
| 02/15/2018 08:01 PM UTC |
CP002394 - Beardshear Hall-Air Handling Unit Replacement
The project consists of, but is not limited to, the removal and demolition of the existing air-handling unit in the mechanical space and the installation of a new air-handling unit in the same location
| 01/30/2018 08:01 PM UTC |
CP002443 - Welch Avenue-CyRide Turnaround
The project consists of, but is not limited to, sidewalk removal, street & sidewalk lights removal/replacement, electrical circuit installation, stripping/spreading of topsoil, excavation, subgrade preparation, PCC sidewalk, PCC curb and gutter, PCC street paving, traffic control and other associated work for a bus turnaround project near the intersection of Welch Avenue and Storm Street in Ames, Iowa on the Iowa State University campus.
| 01/30/2018 08:01 PM UTC |