CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002539 - Veterinary Medicine-Restroom and Locker Room Renovation
The project consists of, but is not limited to, demolition of existing and construction of restroom and locker room facilities. Work includes but is not limited to modifications to plumbing, electrical, mechanical systems finishes, toilet partitions, flooring, ceilings and lighting.
03/21/2019 07:01 PM UTC
CP002517 - Parking Lots 2019-Pavement Preservation-Asphalt
The project consists of, but is not limited to, the removal of existing PCC and HMA pavement, new HMA pavement with PCC curb and gutter, PCC pavement and sidewalks, storm sewer structures and piping, a bioswale, parking lot and sidewalk lighting, surface and subsurface detention, pavement markings, and finish grading/topsoil.
03/14/2019 07:01 PM UTC
CP002517 - Parking Lots 2019-Pavement Preservation-Concrete
The project consists of, but is not limited to, the removal and replacement of the existing PCC parking lot, sidewalk replacement, new storm sewer intake and piping, electrical lighting and conduit, pavement markings, and finish grading/topsoil.
03/14/2019 07:01 PM UTC
CP002461-Utilities-Iowa State Center-Steam Supply Replacement
The project consists of, but is not limited to, providing new direct buried steam piping to all buildings at the Iowa State Center. It includes new steam pipe, new condensate pipe, chilled water pipe relocation, connections in mechanical rooms, new underground concrete vaults, paving, and relocating a 480 power line.
03/05/2019 08:01 PM UTC
CP002544 - Zaffarano Physics Addition-Roof Replacement-Sections L-M
The project consists of, but is not limited to, complete roof system removal down to structural deck and replacement with new insulation and a fully adhered membrane system.
02/21/2019 08:01 PM UTC
CP002516 - Town Engineering Building-Heat and Smoke Detection
The project consists of, but is not limited to, addition of heat and smoke detectors throughout the building. VESDA shall be installed in two-story work areas and one-story areas with large structural pockets. Addressable strobes shall be installed in public areas, and the existing fire alarm control panel shall be relocated.
02/07/2019 08:01 PM UTC
CP002464 - Gilman Hall-Electrical Panel Replacement
The project consists of, but is not limited to, the replacement of a portion of Gilman Hall Electrical panels.
01/29/2019 08:01 PM UTC
CP002412 - Curtiss Hall-Third Floor Renovation
The project consists of, but is not limited to, the alteration of a classroom, office areas, and public hallways on the 3rd floor of Curtiss Hall.
01/24/2019 08:01 PM UTC
CP002492 - Scheman Building-Brunnier Art Museum-Storage and Entrance Remodel
The project consists of, but is not limited to, renovation of permanent collection storage and museum entrance including installation of high density compact storage units, installation of LED lighting, alteration of walls at museum entrance, updated materials and finishes at museum entrance, and remodel of existing office space to accommodate a second exit from the suite.
01/17/2019 08:01 PM UTC
CP002467 - Food Sciences Building-Room 2379 Renovation
The project consists of, but is not limited to, renovation of a teaching classroom, with general, mechanical, and electrical construction in adjacent areas to modify services to serve the classroom. Project includes roof modifications and patching.
12/13/2018 08:01 PM UTC