General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana Fire Station No. 1 Repairs OP 7306 Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
11/05/2019 08:45 PM UTC
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III CAPITAL PROJECT NO. 3264 INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following. Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
10/15/2019 07:45 PM UTC
Project #OP7306
City of Lake Charles, Louisiana Fire Station #3 Remodel Days to Complete Project – 180 Days Liquidated Damages - $270 Per Calendar Day Plans – No Charge The project scope consists of the replacement of finishes throughout the existing fire station. New flooring, painted sheetrock walls, tiles showers, doors & frames, suspended grid ceilings, millwork, and a HVAC system will be provided.
10/15/2019 07:45 PM UTC
Capital Project #CP9778
City of Lake Charles, Louisiana Arcade Amphitheater LED Lighting and Power Improvements Capital Project Number CP #9788 Lake Charles Civic Center Amphitheater Enhancements (LED Lighting & Power Improvements) ADG #18355-A The scope of work for the above mentioned project is as follows: a) Provide 2-200 Amp 3 phase power sources for Amphitheater “show power”. b) Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes). c) Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED.
10/15/2019 07:45 PM UTC
CP3343
City of Lake Charles, Louisiana 2019 Lift Station Rehabilitation CP3343 The project scope of work shall consist of the following: 1. Brentwood • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well top slab. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Fence station. Pour concrete inside fence. 2. Third & McNabb • Replace pumps. • Replace valves and valve vault. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Add bollards to protect new electrical rack. • Fence station. Pour concrete inside fence. 3. Fitzenreiter. • Replace pumps. • Replace valves. Add bypass connection. • Replace wet well access hatch. • Coat wet well. • Replace control panel & switchgear. Add manual transfer switch & SCADA. • Extend aggregate driveway to new station fence. • Fence station. Pour concrete inside fence. • Add slope protection around station.
10/15/2019 07:45 PM UTC
Project No. 2019-692 Capital Project No. 3177
City of Lake Charles, Louisiana Project No. 2019-692 Capital Project No. 3177 W. Prien Lake Road Widening (Cove Lane to Ihles Road) Clearing and Grubbing The general scope of work for Project No. 2019-692, W. Prien Lake Widening Cove Lane to Ihles Road – Clearing and Grubbing Phase, is defined as follows: • The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane. • The demolition of the five (5) homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Drive, and 2801 & 2802 N. Locke Point Drive. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots. All of the work identified above is being done in anticipation of the project to relocate utilities and reconstruct and widen W. Prien Lake Road and Sale Road within the same area.
09/17/2019 07:45 PM UTC
Project No. 2018-683 Capital Project No. 3315
City of Lake Charles, Louisiana Project No. 2018-683 Capital Project No. 3315 Broadmoor Terrace Drainage Improvements Broadmoor to 9th Avenue The general scope for Project No. 2018-683, Broadmoor Terrace Drainage Improvements - Broadmoor to 9th Avenue, is the Installation of a storm collection system from the Southeast corner of East Broadmoor Drive Easterly to the Ninth Avenue storm drainage system. The work involves 18 and 15 inch diameter storm drainage pipe, drainage inlets, roadway pavement, and sidewalk removal and replacement, including utility and fence adjustments as needed.
08/20/2019 07:45 PM UTC
Project No. 2019-690 Capital Project No. 3335
PROJECT NO. 2019-690 CAPITAL PROJECT NO. 3335 KIRKMAN STREET DRAINAGE REHABILITATION CITY OF LAKE CHARLES, LA SCOPE OF WORK The general scope of work for Project No. 2019-690 includes the replacement of the existing drainage line on the East side of Kirkman Street from Pine Street North to Pryce Street. This existing line is undersized and in poor condition. It will be replaced with new 18” diameter RCP and catch basins. The scope of work also includes the replacement of the sidewalk on the East side of Kirkman and the associated street pavement work.
08/20/2019 07:45 PM UTC
Project No. 2019-688 Capital Project No. 3334
City of Lake Charles, Louisiana Project No. 2019-688 Capital Project No. 3334 Henderson Bayou Bridge Rehabilitation The general scope of work includes the installation of grout-filled encasement jackets around timber piles, pile bent bracing replacement, and spall repairs on the concrete bridge structure.
08/06/2019 07:45 PM UTC
Capital Project No. CP3313
City of Lake Charles, Louisiana Shattuck Street Bridge Lake Charles City Capital Project No. CP 3313 Project scope consists of lifting the ends of six 62 foot long Type III girders at the expansion joints (bents 7, 11, 12, 15, 18, and 21) to remove the existing bearing pads and replace them with new bearing pads. Each Type III girder will be lifted at one expansion joint at a time using ten (10) Enerpac RAC-502 (or equivalent) 50 ton hydraulic jacks.
08/06/2019 07:45 PM UTC
221 - 230 of 374 Solicitations
1 2 19 20 21 23 25 26 27 37 38