CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Project No. 2019-691 Capital Project No. 3072
City of Lake Charles, Louisiana
Project No. 2019-691
Capital Project No. 3072
Riverside Park Boat Dock Rehabilitation
The general scope of work includes:
1. Removal of existing wooden pier including a portion of existing concrete sidewalk.
2. Installation of new fixed pier and connecting concrete sidewalk.
3. Installation of new gangway, floating concrete dock assembly, and pipe piles.
| 11/05/2019 08:45 PM UTC |
|
Project No. OP 7306 - Fire Station No. 1
City of Lake Charles, Louisiana
Fire Station No. 1 Repairs
OP 7306
Demolition of the East end of the existing fire station project, to include relocation of existing technology equipment; removal of existing radio tower, antenna, and communication equipment; asbestos abatement; removal of existing foundation and designated concrete paving; patching of the roof and walls of existing building at connections where the building is removed; fencing, grading, and site work following demo to finish the area of work.
| 11/05/2019 08:45 PM UTC |
|
Project CP3264
INTERSTATE CORRIDOR BEAUTIFICATION PHASE III
CAPITAL PROJECT NO. 3264
INTERSTATE 210 / HWY. 14 - LaDOTD PERMIT 153883
SCOPE OF WORK
The general scope of work for Project Interstate Corridor Beautification Phase III, Capital Project No. 3264, for LaDOTD Permitted Project No. 153883 for construction includes the following.
Base bid of planting of selective trees, shrubs and performing one (1) maintenance operations per plans and specification for a 90 calendar day construction period.
| 10/15/2019 07:45 PM UTC |
|
Project #OP7306
City of Lake Charles, Louisiana
Fire Station #3 Remodel
Days to Complete Project – 180 Days
Liquidated Damages - $270 Per Calendar Day
Plans – No Charge
The project scope consists of the replacement of finishes throughout the existing fire station. New flooring, painted sheetrock walls, tiles showers, doors & frames, suspended grid ceilings, millwork, and a HVAC system will be provided.
| 10/15/2019 07:45 PM UTC |
|
Capital Project #CP9778
City of Lake Charles, Louisiana
Arcade Amphitheater LED Lighting and Power
Improvements
Capital Project Number CP #9788
Lake Charles Civic Center
Amphitheater Enhancements (LED Lighting & Power Improvements)
ADG #18355-A
The scope of work for the above mentioned project is as follows:
a) Provide 2-200 Amp 3 phase power sources for Amphitheater “show power”.
b) Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes).
c) Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED.
| 10/15/2019 07:45 PM UTC |
|
CP3343
City of Lake Charles, Louisiana
2019 Lift Station Rehabilitation
CP3343
The project scope of work shall consist of the following:
1. Brentwood
• Replace pumps.
• Replace valves and valve vault. Add bypass connection.
• Replace wet well top slab.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Fence station. Pour concrete inside fence.
2. Third & McNabb
• Replace pumps.
• Replace valves and valve vault. Add bypass connection.
• Replace wet well access hatch.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Add bollards to protect new electrical rack.
• Fence station. Pour concrete inside fence.
3. Fitzenreiter.
• Replace pumps.
• Replace valves. Add bypass connection.
• Replace wet well access hatch.
• Coat wet well.
• Replace control panel & switchgear. Add manual transfer switch & SCADA.
• Extend aggregate driveway to new station fence.
• Fence station. Pour concrete inside fence.
• Add slope protection around station.
| 10/15/2019 07:45 PM UTC |
|
Project No. 2019-692 Capital Project No. 3177
City of Lake Charles, Louisiana
Project No. 2019-692
Capital Project No. 3177
W. Prien Lake Road Widening (Cove Lane to Ihles Road) Clearing and Grubbing
The general scope of work for Project No. 2019-692, W. Prien Lake Widening Cove Lane to Ihles Road – Clearing and Grubbing Phase, is defined as follows:
• The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane.
• The demolition of the five (5) homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Drive, and 2801 & 2802 N. Locke Point Drive. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots.
All of the work identified above is being done in anticipation of the project to relocate utilities and reconstruct and widen W. Prien Lake Road and Sale Road within the same area.
| 09/17/2019 07:45 PM UTC |
|
Project No. 2018-683 Capital Project No. 3315
City of Lake Charles, Louisiana
Project No. 2018-683
Capital Project No. 3315
Broadmoor Terrace Drainage Improvements
Broadmoor to 9th Avenue
The general scope for Project No. 2018-683, Broadmoor Terrace Drainage Improvements - Broadmoor to 9th Avenue, is the Installation of a storm collection system from the Southeast corner of East Broadmoor Drive Easterly to the Ninth Avenue storm drainage system. The work involves 18 and 15 inch diameter storm drainage pipe, drainage inlets, roadway pavement, and sidewalk removal and replacement, including utility and fence adjustments as needed.
| 08/20/2019 07:45 PM UTC |
|
Project No. 2019-690 Capital Project No. 3335
PROJECT NO. 2019-690
CAPITAL PROJECT NO. 3335
KIRKMAN STREET DRAINAGE REHABILITATION
CITY OF LAKE CHARLES, LA
SCOPE OF WORK
The general scope of work for Project No. 2019-690 includes the replacement of the existing drainage line on the East side of Kirkman Street from Pine Street North to Pryce Street. This existing line is undersized and in poor condition. It will be replaced with new 18” diameter RCP and catch basins. The scope of work also includes the replacement of the sidewalk on the East side of Kirkman and the associated street pavement work.
| 08/20/2019 07:45 PM UTC |
|
Project No. 2019-688 Capital Project No. 3334
City of Lake Charles, Louisiana
Project No. 2019-688
Capital Project No. 3334
Henderson Bayou Bridge Rehabilitation
The general scope of work includes the installation of grout-filled encasement jackets around timber piles, pile bent bracing replacement, and spall repairs on the concrete bridge structure.
| 08/06/2019 07:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.