General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP 3264
City of Lake Charles, Louisiana INTERSTATE CORRIDOR BEAUTIFICATION PHASE II LaDoTD Permit No. 153754 Capital Project Number CP3264 The general scope of work for Project Interstate Corridor Beautification Phase II, Capital Project No. 3264, for LaDOTD Permitted Project No. 153754 for construction includes the following. Base bid of clearing and grubbing of selective trees, planting of trees, and shrubs. Add alternate no. 1 of maintenance operations of selective areas within the interchange by way mowing grass, weed control, volunteer vegetation growth removal, mulching for one year period. See ‘Exhibit A’ identifying the selective areas for maintenance operations.
11/20/2018 08:45 PM UTC
Project No. 2018-678 (PR0002)
City of Lake Charles, Louisiana Project No. 2018-678 (PR0002) North Beach Improvements - Erosion Repair North Beach to Promenade The scope of work includes revetment and shore erosion repair, drainage and piping installation, sidewalk repair, and gutter paving.
11/06/2018 08:45 PM UTC
Project No. CP3051, LEI Project No. 18-010
City of Lake Charles, Louisiana 2018 City Wide Striping Project City of Lake Charles Project No. CP3051 LEI Project No. 18-010 The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of the removal of existing pavement markings and construction of new pavement markings for the following streets at various locations in the City of Lake Charles: 1. General Doolittle Street (Highway 14 to General Twinning Street) 2. Holly Hill Road (Chrysler Street to Sale Road) 3. 1st Avenue (Prien Lake Road to Broad Street) 4. 2nd Avenue (Prien Lake Road to Broad Street) 5. 3rd Avenue (Prien Lake Road to Broad Street) 6. 4th Avenue (Prien Lake Road to Broad Street) 7. 6th Avenue (12th Street to 6th Street) 8. 6th Street (4th Avenue to Highway 14) 9. 7th Avenue (Prien Lake Road to 12th Street) 10. Common Street (McNeese Street to Sale Road) 11. Lake Street (Prien Lake Road to Shell Beach Drive) 12. Lake Street (McNeese Street to Sale Road) 13. Louisiana Avenue (Mill Street to 6th Street) 14. North Goos Boulevard (Opelousas Street to Knapp Street) 15. Sallier Street (Lake Street to Hodges Street) 16. 14th Street (Highway 14 to 4th Avenue) 17. School Street (Louisiana Avenue to Lake Street) 18. Power Center Parkway (Highway 14 to 5th Avenue) 19. Pine Street (Lakeshore Drive to Hodges Street) 20. Pryce Street (Lakeshore Drive to Enterprise Boulevard) 21. South Division Street (Kirkman Street to Enterprise Boulevard) 22. Enterprise Parkway (Interstate 10 to Katherine Street) 23. Bord du Lac Drive (Lakeshore Drive to North Lakeshore Drive) 24. 5th Avenue (570 linear feet at new bridge) The Owner reserves the right to remove streets from the project or add streets to the project to bring the construction cost within the budget established for the project without affecting unit prices bid for the items of work.
11/06/2018 08:45 PM UTC
Capital Project Number CP3256
City of Lake Charles, Louisiana Comeaux Street Drainage Improvements and Overlay Project North Grace Street to Dead End Capital Project Number CP3256 ~ I. Scope of Services: The City of Lake Charles desires to construct a closed drainage system and perform an asphalt overlay of Comeaux Street consisting of the following: • Installing 15”, 18” and 24” RCP culverts in existing ditches; • Constructing drop inlets as shown on plans; • Installing a 2 ½“asphalt overlay and other incidentals as required.
10/16/2018 07:45 PM UTC
Capital Project No. CP#3298
CITY OF LAKE CHARLES, LOUISIANA Common St. and Legion Street Lift St. Rehabilitation Capital Project No. CP#3298 ~ I. Scope of Services: A. Common St. 1. Replace the two existing pumps with new dry pit submersible pumps. 2. Replace all discharge piping and valves. 3. Demolish existing wooden fence and replace with green slatted hurricane fence. 4. Electrical improvements. 5. Coat wet well. B. Legion 1. Replace the two existing pumps with new submersible pumps on a rail system. 2. Replace all discharge piping and valves. 3. Demolish existing top deck and replace with new reinforced concrete top deck with access hatch. 4. Demolish existing hurricane fence and replace with green slatted hurricane fence. 5. Electrical improvements. 6. Coat wet well.
10/16/2018 07:45 PM UTC
Project No. 2017-670 Capital Project No. 2894
City of Lake Charles, Louisiana Project No. 2017-670 Capital Project No. 2894 Sewer Main Rehabilitation 3rd & 9th Ave., 5th, 6th, 8th, 10th St., Legion St., Oklahoma St. The general scope of work for Project No. 2017-670 includes the rehabilitation of existing sewer mains by cured-in-place pipe lining and pipe bursting, with service line reinstatement and all incidental pavement repair, as required, dress-up, and manhole rehabilitation.
10/02/2018 07:45 PM UTC
Project No. 2018-679 (OP0403)
City of Lake Charles, Louisiana Project No. 2018-679 (OP0403) Fire Station No. 7 Building Repairs The scope of work includes the installation of “push piers” under grade beams for foundation stabilization, replacement of the front porch and front sidewalk to establish positive drainage, cleaning and repairs to the exterior CMU and brick wall surfaces, roof flashing repairs, waterproofing with caulking around wall penetrations and water repellent on wall surfaces, and repainting of door frames, doors, and damaged areas of the interior of the truck bay walls.
09/18/2018 07:45 PM UTC
Capital Project Number CP3234
CITY OF LAKE CHARLES, LOUISIANA HIGHWAY STREET AND NORTH GRACE STREET DRAINAGE IMPROVEMENTS – PHASE II CAPITAL PROJECT NUMBER CP3234 The City of Lake Charles desires to improve the drainage conditions to portions of N. Grace St. and Highway St. sub basing as funds permit: 1. Highway Street - North Side (Martin Luther King Hwy. to N. Grace Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system. 2. N. Grace Street – East Side (Hwy St. to Guinn Street) a. Removing existing culverts for existing driveway crossings and installing a new closed drainage system.
09/18/2018 07:45 PM UTC
Capital Project Number CP3301
CITY OF LAKE CHARLES, LOUISIANA DOME LIFT STATION REHABILITATION CAPITAL PROJECT NUMBER CP3301 ~ The Dome Lift Station Rehabilitation Scope of Work includes, but is not necessarily limited to, the following: • Furnishing, installation, maintenance, and operation of a temporary bypass sewer pumping system inclusive of traffic controls. • Removal of existing pumps, valves, and electrical components for salvage by the City of Lake Charles Wastewater Division. • Demolition of structural, mechanical, and electrical portions of the existing Dome Lift Station as noted on the project drawings. • Cleaning of the interior of the remaining RCP wet well. • Construction of new reinforced concrete top slab for wet well inclusive of furnishing and installing aluminum access hatchway and fall through protection system. • Furnishing and installation of interior liner and coating system for inside of wet well and underside of top slab. • Furnishing and installation of mechanical systems including all duplex submersible pumps, guiderails, piping, valves, fittings, and specialties. • Furnishing and installation of specified components necessary for the installation a new electrical service separate from the existing electrical service from the Lake Charles Housing Authority office building. • Furnishing and installation of new electrical switchgear, controls panels, conduit and wiring, SCADA system, and other electrical components necessary for proper operation of the pump stations as shown on the drawings and as specified. • Furnishing of all site civil work including excavation, trenching, backfill, new aggregate surfaces, chain link fencing and gates, etc. as shown on the drawings and as specified.
09/04/2018 07:45 PM UTC
Capital Project Number CP3128
City of Lake Charles, Louisiana WWTP B/C Expansion and Rehabilitation Project Phase II Demolition Capital Project Number CP3128 I. Scope of Services: A. A new WWTP B/C facility is currently operational for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases. B. This scope of work covers Phase II of the demolition. The Work includes, but is not necessarily limited to, the following: 1. Removal and disposal of mechanical and electrical equipment and demolition of existing tankage at existing WWTPs B and C. 2. Installation of a sludge return pump and skid mounted gravity belt thickening system. 3. Installation of a pre-engineered aluminum canopy. 4. Removal and disposal of existing motor control center and installation of new motor control center. 5. Miscellaneous civil/site improvements.
08/14/2018 07:45 PM UTC
241 - 250 of 374 Solicitations
1 2 21 22 23 25 27 28 29 37 38