CP3427
CITY OF LAKE CHARLES, LOUISIANA
WASTEWATER TREATMENT PLANT B/C
SLUDGE PROCESSING IMPROVEMENTS
CAPITAL PROJECT NUMBER CP3427
I. Scope of Services:
Contractor shall complete the Work as specified and indicated in the Contract Documents for Wastewater Treatment Plant B/C – Sludge Processing Improvements (Capital Project Number CP3427). This Work includes, but is not limited to, the following:
• Removal and Replacement of Pressurized Air Headers/Diffusers within Digestors.
• Installation of Access Hardware for Operation/Maintenance of Digestors.
• Construction of New Blower Building for Process Equipment.
• Removal and Replacement of Air Blowers and Header Piping for Aerated Digestion.
• Construction of New Motor Control Center.
• Reconstruction of Existing Sludge Pump Station.
• Construction of New Sludge Processing Building.
• Installation of Screw Presses for Solids Processing.
• Installation of Dewatering Polymer Feed System.
• Installation of Conveyance System for Solids Handling/Disposal.
• Interconnections to Owner’s SCADA for Control/Monitoring.
• Miscellaneous Civil, Mechanical, and Electrical Work as Required to Complete the Work.
| 12/16/2025 08:45 PM UTC |
|
Project No. 2025-748 Capital Project No. 3224
City of Lake Charles, Louisiana
Muirfield Drive Drainage-Phase II
Project No. 2025-748
Capital Project No. 3224
The general scope of work for Muirfield Drive Drainage Phase II consists of the installation of approximately 1400 linear feet of 36” diameter storm drainage pipe to augment the existing drainage system. This pipe installation begins on the west side of Lot 19 of Turnberry Row subdivision and continues to the west line and into Lot 5 of the Muirfield Village Phase One subdivision. This additional drainage system will be installed along and within the limits of the Lake Charles Country Club Golf Course boundary.
| 01/06/2026 08:45 PM UTC |
|
Project No. 2023-726 Capital Project No. 3019
Project No. 2023-726
Capital Project No. 3019
Sale Road Bridge Repair
City of Lake Charles, LA
The general scope of work for this project is the repair of the Sale Road bridge over Lateral L-2A of Contraband Bayou. This bridge exhibited various defects shortly after it was constructed in 2014. These defects included road pavement settlement, broken tie-rods, drainage pipe/box failures, etc. This project’s repair scope includes:
• Construction of a new concrete deadman tie-rod anchor assembly to restore support to the sheet pile wall;
• Replace failed drainage concrete pipe and boxes;
• Removal and replacement of reinforced concrete pavement;
• The associated traffic management, including detour signage.
| 01/06/2026 08:45 PM UTC |
| Number | Deadline |
|---|---|
|
Capital Project No. CP3313
City of Lake Charles, Louisiana
Shattuck Street Bridge
Lake Charles City Capital Project No. CP 3313
Project scope consists of lifting the ends of six 62 foot long Type III girders at the expansion joints (bents 7, 11, 12, 15, 18, and 21) to remove the existing bearing pads and replace them with new bearing pads. Each Type III girder will be lifted at one expansion joint at a time using ten (10) Enerpac RAC-502 (or equivalent) 50 ton hydraulic jacks.
| 08/06/2019 07:45 PM UTC |
|
Project No. 2019-689 Capital Project No. 3024
City of Lake Charles, Louisiana
Project No. 2019-689
Capital Project No. 3024
Russell Street Bridge Rehabilitation ~
The general scope of work for Project No. 2019-689, Capital Project No. 2968, Russell Street Bridge Piling Rehabilitation, includes the following:
(a) Bridge piling rehabilitation with grout-filled jackets;
(b) Bridge piling rehabilitation with new pile splices with galvanized channel bracing;
(c) Spall repair on underside of concrete bridge structure;
(d) Sway bracing removal and placement;
(e) Erecting and maintaining signage and barricades for detour routing;
(f) Approach slab removal and replacement.
| 07/16/2019 07:45 PM UTC |
|
Project No. 2019-687 Capital Project No. 3332
City of Lake Charles, Louisiana
Project No. 2019-687
Capital Project No. 3332
Port Wonder Utilities Extension
The general scope of work includes the extension of a 12” diameter water main from the Northwest corner of the Old Harrah’s Parking Garage Tract West approximately 630 feet to the East property line of the City of Lake Charles Alligator Pond Tract, including fire hydrant assemblies and service connection points for the future Port Wonder Development, and the extension of a 10” diameter sewer main from the Northeast corner of the Old Harrah’s asphalt parking lot West approximately 1100 feet, including manholes. Pavement removed at the Port Wonder site will not be replaced. Pavement removed at the Old Harrah’s site will be replaced.
| 06/18/2019 07:45 PM UTC |
|
CP 3303
City of Lake Charles, LA
New Transit Bus Storage Facility
CP 3303
The project consists of the new construction of a 7500 square foot pre-engineered metal canopy building and associated site improvements. The contract duration is 180 days with liquidated assessed at a rate of $270.00 dollars per calendar a day.
| 06/04/2019 07:45 PM UTC |
|
CP3297
City of Lake Charles, Louisiana
WWTP A BASIN A-03 REHABILITATION PROJECT
CP3297
I. Scope of Services:
A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system.
B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed.
C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-03. The Work includes, but is not necessarily limited to, the following:
1. Pipe bursting 8080 linear feet of existing 8” and 10” sewer to new 8” and 10”.
2. 30 point repairs to 8” sewer pipe at varying depths 0-12’.
3. 70’ of open cut replacement, 4 point repairs to 18” sewer pipe.
4. Replacement of approximately 132 active sewer service laterals.
5. Coating approximately 350 vertical feet of existing and new manholes.
6. Furnish and Install 3 new manholes.
| 05/14/2019 07:45 PM UTC |
|
Project No. 2018-680 Capital Project No. 3252
City of Lake Charles, Louisiana
Project No. 2018-680
Capital Project No. 3252
2018 CDBG South Roosevelt Drainage Improvements Phase Two ~
The general scope of work for Project No. 2018-680 includes installation of reinforced concrete pipe and catch basins for drainage improvements and pavement work.
| 04/30/2019 07:45 PM UTC |
|
MAI Project No. B6-18063-DA, CP# 3312
City of Lake Charles, Louisiana
2017 CDBG Infrastructure – Asphalt Overlay of Various Streets
MAI Project No. B6-18063-DA
Capital Project No. CP3312
| 04/16/2019 07:45 PM UTC |
|
Project No. 2018-682 Capital Project No. 3283
PROJECT NO. 2018-682
CAPITAL PROJECT NO. 3283
LEGENDRE STREET DRAINAGE PH II
CITY OF LAKE CHARLES, LOUISIANA
SCOPE OF WORK
Project No. 2018-682 includes installation of approximately 470 linear feet of 8x7 box culvert on the East roadside ditch of Legendre Street starting at the downstream end near the Cell tower driveway and extending South tying into the existing box culvert at McNeese Street.
| 04/16/2019 07:45 PM UTC |
|
Project No. 2019-684, Capital Project No. 3093
City of Lake Charles, Louisiana
Project No. 2019-684
Capital Project No. 3093
Maidstone and Woodside Drive Drainage Pipe Rehabilitation
The goal of this project is to rehabilitate existing reinforced concrete drain lines on Woodside Drive and Maidstone Drive in the City of Lake Charles, LA with cured-in-place pipe lining.
| 02/05/2019 08:45 PM UTC |
|
Project No. 2018-672, Capital Project No. 3308
City of Lake Charles, Louisiana
Project No. 2018-672 (Capital Project No. 3308)
Streetscape – Mill and Division
The goal of this project is to enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings.
| 01/15/2019 08:45 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.