General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project Number CP3302
Capital Project Number CP3302 Southwest Water Treatment Plant Horizontal Pressure Filter Rehabilitation City of Lake Charles, LA ~ I. Scope of Services: The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the Southwest Water Treatment Plant. This Work will include but is not limited to the following: 1. Removal and replacement of the Filter Media within Filters #1 – 6 a. Estimated Total Volume Needed: 4,320 ft.3 b. 24” Layer of Manganese Greensand & 12” Layer of Anthracite 2. Removal and replacement of the Existing Gravel Bed and Retaining Screen 3. Removal and replacement of the Existing Underdrain Valves 4. Removal and replacement of additional Filter Internals as Required 5. Removal and replacement of the existing air scour piping and discharge nozzles. 6. Removal and replacement of the existing backwash water flow meter.
02/20/2018 08:45 PM UTC
Project No. 2016-650, Capital Project No. 3268
Project No. 2016-650 Capital Project No. CP3268 Nelson Road Sewer Force Main Upgrade Country Club Road to Linden Lane City of Lake Charles, LA ~ This scope of work for Project No. 2016-650, Nelson Road Sewer Force Main Upgrade – Country Club Road to Linden Lane, includes the installation of a new 10 inch diameter force main from the intersection of Nelson Road and Country Club Road South to tie into an existing 10 inch diameter force main North of Linden Lane. This new force main will service the existing Pecan Acres sewer lift station and will include a connection for the option of receiving flow from the Nelson Pointe Apartments sewer lift station.
02/06/2018 08:45 PM UTC
Capital Project No. CP3128
WWTP B/C Expansion and Rehabilitation Project Phase I Demolition Capital Project Number CP3128 City of Lake Charles, LA ~ I. Scope of Services: A. A new WWTP B/C facility is currently under construction for The City of Lake Charles. Decommissioning of the existing WWTP B/C has been divided into two phases. B. This scope of work covers Phase I of the demolition. The Work includes, but is not necessarily limited to, the following: 1. Removal and disposal of mechanical and electrical equipment from existing tankage at existing WWTPs B and C. 2. Demolition and filling of existing tankage at existing WWTPs B and C. 3. Installation of approximately 250 linear feet of 8-inch PVC, 20 linear feet of 24-inch ductile iron pipe, 90 linear feet of 30-inch HDPE, 372 linear feet of 48-inch ductile iron pipe, one new reinforced cast in place concrete collection box, and one 8-ft diameter FRP manhole. 4. Coating of two existing manholes and one new reinforced cast in place concrete collection box.
01/16/2018 08:45 PM UTC
Capital Project No. CP3264
Capital Project No. CP3264 Interstate Corridor Beautification Project Phase I REBID City of Lake Charles, LA ~ NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562 SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565 COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following. North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs. South I-10 Service Road - Installation of trees, palms, and shrubs. Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
01/16/2018 08:45 PM UTC
Project No. CP3264 Interstate Corridor Beautification Phase I (REBID)
Capital Project No. CP3264 Interstate Corridor Beautification Project Phase I REBID City of Lake Charles, LA ~ NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562 SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565 COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following. North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs. South I-10 Service Road - Installation of trees, palms, and shrubs. Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
01/16/2018 08:45 AM UTC
Capital Project Number OP 0601
Capital Project Number OP 0601 Chennault Water Treatment Plant 400,000 Gallon Elevated Water Storage Tank Rehabilitation City of Lake Charles, LA ~ I. Scope of Services: A. The City of Lake Charles Water Division currently owns and operates the 400,000 Gallon Elevated Storage Tank at the Chennault Water Treatment Plant. Rehabilitation of the existing tank in general includes: a. Drainage improvements around the tank b. Erection and maintenance of a temporary containment system to contain sand blasting and paint debris from falling on adjacent properties and vehicles. c. Light sand blasting of the tank exterior and appurtenances and applying a three coat exterior coating system to the entire tank exterior. d. Sandblasting interior tank walls and appurtenances and applying 3 coat interior coating system to these surfaces. e. Perform the necessary adjustments to windages/sway rods to return the tank to its original erect, design conformance. f. Furnish and install repairs and improvements to the interior roof, vent, roof ladder, etc. g. Remove and dispose of existing overflow piping within tank riser and buried vault. Install new, exterior overflow piping to discharge into a closed drainage system to be routed to the adjacent ditch.
01/02/2018 08:45 PM UTC
Capital Project No. CP3273, LEI Project No. 17-011
Capital Project No. CP3273 LEI Project No. 17-011 2017 Asphalt Overlays City of Lake Charles, LA ~ SCOPE OF WORK The intent of this Contract is to provide for construction and completion, in every detail, of the Work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the Work in accordance with the plans, specifications, and terms of the Contract. The project consists of pavement patching, degrassing edge of road and grading shoulders, adjusting sanitary sewer manholes to grade, adjusting storm drain catch basins to grade, cold planing asphaltic concrete pavement, asphaltic concrete surface course, pavement markings, asphaltic concrete ramps at paved driveways, aggregate surface course on aggregate driveways, topsoil shoulder material, and hydro-seeding for the following streets at various locations in the City of Lake Charles: 1. Edgewood Lane (West Prien Lake Road to Magnolia Lane) 2. Mount Talbot Street (Fruge Street to McNabb Street) 3. Timberline Drive (Shasta Street to Dead End) 4. Cappy Drive (Nelson Road to Sale Road) 5. Charles Drive (Lela Drive to Nelson Road) 6. Lela Drive (Sale Road to Cappy Drive) 7. Junior Street (Napp Street to Theriot Street) 8. Tuten Drive (Cappy Drive to Charles Street) 9. Nicholas Street (Nelson Road to Dead End) 10. Melvin Lane (Alma Lane to Nelson Road) 11. Ponderosa Drive (Lisle Peters Road to Dead End) 12. Opelousas Street (North Louisiana Avenue to Enterprise Boulevard)) 13. Walker Street (Poe Street to Medora Street) 14. Highway Street (Highway 171 to North Grace Street) 15. North Grace Street (Medora Street to Dead End) 16. Street Removed from Project 17. North Louisiana Avenue (Opelousas Street to Bauer Street) 18. Fournet Street (North Louisiana Avenue to Enterprise Boulevard) 19. Poe Street (Highway 171 to Walker Street) 20. Magnolia Lane (West Prien Lake Road to Edgewood Lane)
12/19/2017 08:45 PM UTC
Project No. CP3242
Capital Project No. CP3248 WWTP A Basin A-04 Rehabilitation Project City of Lake Charles, LA ~ I. Scope of Services: A. The City of Lake Charles WWTP ‘A’ is currently under a Compliance Order (CO) with LDEQ. The approved CO schedule requires the rehabilitation of 13 sub basins in the WWTP ‘A’ Basin. The Sub Basins have been prioritized and ranked in order of severity of condition through wastewater modeling of the system. B. Based on review of CCTV data of the Sub-Basin, recommendations for repair have been made and a cost estimate has been developed. C. This scope of work covers the repair of the collection system in the WWTP A Sub Basin A-04. The Work includes, but is not necessarily limited to, the following: 1. Pipe bursting 16,560 linear feet of existing 6” and 8” sewer to new 8”. 2. Open cut and replace 1,716 linear feet of existing 6” and 8” sewer to new 8”. 3. Replacement of approximately 275 active sewer service laterals. 4. Coating approximately 350 vertical feet of existing and new manholes.
12/19/2017 08:45 PM UTC
Project No. 2016-656, Capital Project No. 3252
Project No. 2016-656 Capital Project No. 3252 South Roosevelt Drainage Improvements Phase One City of Lake Charles, LA ~ The general scope of work for Project No. 2016-656 includes installation of reinforced concrete pipe and catch basins for drainage improvements at the intersection of McKinley Street and South Roosevelt Street. The new drainage outfall pipe will discharge South to Lateral L-14 of W-20 Main.
11/14/2017 08:45 PM UTC
Project No. CP3264
Capital Project No. CP3264 INTERSATE CORRIDOR BEAUTIFICATION PHASE 1 City of Lake Charles, LA ~ NORTH I-10 EXIT RAMP 30 B AND SERVICE ROAD- LaDOTD PERMIT 153562 SOUTH I-10 SERVICE ROAD LaDOTD PERMIT 153565 COVE LANE AND ROUNDABOUT- LaDOTD PERMIT 153586 SCOPE OF WORK The general scope of work for Project Interstate Corridor Beautification Phase I, Capital Project No. 3264, includes the following. North I-10 Exit Ramp 30 B and Service Road - Installation of trees, palms, and shrubs. South I-10 Service Road - Installation of trees, palms, and shrubs. Cove Lane and Roundabout - installation of trees, palms, shrubs, and installation within the roundabout borrow fill material, concrete curbing, aluminum edging, and decorative stone with binding solution.
10/17/2017 07:45 PM UTC
261 - 270 of 374 Solicitations