General Info

Business Logo

City of Lake Charles

326 Pujo Street, Lake Charles, LA 70601
(337) 491-1263


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP3511
Huber Park Playground and Parking Improvements Lake Charles City Project No. CP3511 1. Relocation of existing playground equipment at southeast corner of Huber Park to more central location at the park. 2. The addition of approximately 35 internal parking spaces at the southeast corner of the park. The parking will accommodate access points on both 4th Avenue and Orchid Street to avoid dead end circulation.
05/06/2025 07:45 PM UTC
CP3450
CITY OF LAKE CHARLES, LOUISIANA WASTEWATER TREATMENT PLANT ‘A’ OPERATIONAL RELIABILITY IMPROVEMENTS LIFT STATION ELECTRICAL UPGRADES CAPITAL PROJECT NUMBER CP3450 I. Scope of Services: Contractor shall complete all Work as specified or indicated for Wastewater Treatment Plant ‘A’ – Operational Reliability Improvements – Lift Station Electrical Upgrades. The Work includes, but is not limited to, the following: • Booker Street Lift Station (120 N. Booker Street) o Earthwork to Erect Access Driveways for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • N. Blake Street Lift Station (1306 N. Blake Street) o Clearing and Grubbing to Facilitate the Work o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Opelousas Street Lift Station (3038 Opelousas Street) o Furnish and Install Domestic Water Service o Furnish and Install Bypass Connection for Temporary Service o Remove and Replace Existing Wet Well Topping Slab and Valve Vault o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Furnish and Install Temporary Bypass Pumping to Maintain Site Operation o Removal and Replacement of Existing Electrical Rack o Installation and Commissioning of an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Installation and Commissioning of a Duplex Pump Control Panel o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Broad Street Lift Station (3219 Broad Street) o Furnish and Install Bypass Connection for Temporary Service o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • 3rd Ave. & 3rd St. Lift Station (949 Third Avenue) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Replacement and Installation of Misc. Electrical Gear/Fixtures o Replacement of Existing SCADA Components to Upgrade Site Communication o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Colletta Street Lift Station (2218 Colletta Street) o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • St. John Street Lift Station (1318 St. John Street) o Furnish and Install Bypass Connection for Temporary Service o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site • Cline Street Lift Station (2715 Cline Street) o Clearing and Grubbing to Facilitate the Work o Erection of Concrete Revetment for Embankment Protection o Earthwork to Erect Access Driveway for Project Site o Erection of Fencing/Gates for Site Security o Relocation of Existing OHP Service in Coordination with Utility Provider o Replacement of Existing MTS with an Automatic Transfer Switch o Installation and Commissioning of a Diesel Back-Up Generator o Installation and Commissioning of a Triplex Pump Control Panel o Installation and Commissioning of Three (3) Variable Frequency Drives o Installation and Commissioning of Pump Junction Box and Level Junction Box o Installation and Commissioning of a SCADA Panel o Alternate No. 1: Earthwork to Place Aggregate Surfacing across Project Site
05/20/2025 07:45 PM UTC
CP2876
CITY OF LAKE CHARLES, LOUISIANA CITY HALL BACK UP POWER AND MCC IMPROVEMENTS PROJECT CAPITAL PROJECT NUMBER CP2876 I. Background: In light of recurring power failures and a lack of adequate back-up power facilities at the City Hall Facility, the City would like to replace the existing facilities with a reliable, secondary power source. Additionally, due to location of and the recent damage to the buildings motor control center it is the desire of the City to harden this facility with an exterior motor control center and installation of properly sized back-up power facilities to mitigate future, potential concerns in event of outages related to hurricanes, hard freezes, etc. This project will improve the facility’s durability, preparedness for natural disasters, sustainability for the operation of the City, and increase reliability for customers system-wide. II. Scope of Services: Design of complete electrical and back-up power solutions. This Work shall include: • Furnish and Install 450KW, Natural Gas Generator • Furnish and Install an Automatic Transfer Switch • Installation of Generator Slab • Installation of a new exterior MCC building • Installation of a new MCC • Installation of splice blocks, conduit and wire to extend existing feeds to MCC building. • Miscellaneous Site Improvements including concrete paving modifications, fencing modifications, etc. • Interconnections of Generator/MCC improvements to existing infrastructure
05/20/2025 07:45 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Capital Project Number CP3305
CITY OF LAKE CHARLES, LOUISIANA GEORGE H. WEST WATER TREATMENT PLANT PRESSURE FILTER SYSTEM REHABILITATION AND IMPROVEMENTS CAPITAL PROJECT NUMBER CP3305 I. Scope of Services: The City of Lake Charles desires to rehabilitate the six (6) existing horizontal pressure filters at the George H. West Water Treatment Plant. This Work will include but is not limited to the following: 1. Complete Removal and Replacement of Filter Internals within all (6) Filters: a. Remove 30” of Manganese Anthrasand and Replace with 20” of Manganese GreensandPlus and 10” of Anthracite. b. Removal and Replacement of Existing Gravel Bed. c. Replacement of Existing PVC Components with Stainless Steel. d. Installation of Gravel Retaining Screen. e. Modify Existing Underdrain Strainers to Accommodate Sandvalves. f. Conditioning of Filter Media and Disinfection of the Filter Vessels. 2. Modify Air Scour Header to force Draindown. 3. Replacement of Filter Control Panel for additional Control. 4. Removal and Replacement of Existing Air Blower for Air Scour. 5. Modifications to Existing Backwash Pumps and associated Piping. 6. Installation of Slow Fill Line with Modulating Control Valve for Backwash. 7. Replacement of Existing Backwash Pump Controls with VFDs and New Backwash Control Panel. 8. Removal and Replacement of Existing Backwash Flow Meter. 9. Modification of Backwash Line Discharge into Recovery Basin. 10. Coating and Rehabilitation of Fluoride Secondary Containment Vessel. 11. Complete Touch-Ups as Required for Damaged Coating on Filter Vessels. 12. Installation of In-Line Static Mixer on Raw Water Influent Line.
07/17/2018 07:45 PM UTC
Project No. 2016-661 Capital Project No. 3224
Project No. 2016-661 Capital Project No. 3224 Muirfield and Turnberry Drainage Outfall Improvements Across the Lake Charles Country Club City of Lake Charles, LA ~ The general scope of work for Project No. 2016-661 includes installation of new drainage inlets and pipe, including the associated driveway and pavement work.
06/19/2018 07:45 PM UTC
Project No. 2018-677 Capital Project No. 3207
City of Lake Charles, Louisiana Project No. 2018-677 Capital Project No. 3207 Enterprise Blvd. Paving and Drainage Rehabilitation Phase 1 (Re-Bid) The general scope of work for Project No. 2018-677 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
06/05/2018 07:45 PM UTC
Project No. 2018-676 Capital Project No. 3093
City of Lake Charles, Louisiana Project No. 2018-676 Capital Project No. 3093 Alma Lane Drainage Improvements The general scope of work for Project No. 2018-676 includes improvements to roadside ditches, including reinforced concrete pipe and catch basin installation.
06/05/2018 07:45 PM UTC
Capital Project Number CP3253
City of Lake Charles, Louisiana West McNeese Street Drainage and Sidewalk Improvements – Barbe High School Property to Nelson Road – Capital Project Number CP3253 Substantial Completion – 150 Calendar Days I. Scope of Services: The City of Lake Charles desires to install closed drainage and a sidewalk along the north side of W. McNeese Street. The scope of work to complete these improvements will include, but is not limited to the following: 1. W. McNeese Street (End of Barbe HS Property to Nelson Road) a. Remove the existing drainage and install new, closed drainage to promote positive drainage within the area. b. Install a curb and gutter section along the existing edge of road. c. Install a sidewalk along the north side of the road to assist with pedestrian and school traffic.
04/17/2018 07:45 PM UTC
Project No. 2018-674 Capital Project No. 3131
Project No. 2018-674 Capital Project No. 3131 Lake Street Reconstruction From Westmoreland Street South to Waverly Street City of Lake Charles, LA ~ The general scope of work for Project No. 2018-674, Lake Street Extension from Westmoreland Street South to Waverly Street, includes the following: 1. Paving: Construct a new 10 inch thick, 48 to 54 foot wide reinforced concrete pavement with integral curb and 8” compacted stone base. New six foot (6’) wide plain concrete sidewalk on the east side of the street will be constructed. Approximate project length is about 550 linear feet. 2. Water: Replace the existing 8 inch PVC water line crossing Lake Street at Wedgewood with a new 8 inch DR-11 HDPE water pipe via directional drill, including valves, fittings, and fire hydrant. The existing 8 inch PVC water line will be abandoned in place or removed as required. 3. Drainage: Install new underground drainage system.
04/17/2018 07:45 PM UTC
Project No. 2017-667 Capital Project No. 3270
Project No. 2017-667 Capital Project No. 3270 CDBG 5th Avenue Sidewalk Improvements City of Lake Charles, LA ~ The general scope of work for Project No. 2017-667, Capital Project No. 3270, CDBG - 5th Avenue Sidewalk Improvements, includes installation of new concrete sidewalks, complete with ADA compliant surfaces at select locations.
04/17/2018 07:45 PM UTC
Project No. 2017-668 Capital Project No. 3207
City of Lake Charles, Louisiana Project No. 2017-668 Capital Project No. 3207 Enterprise Blvd. Paving and Drainage Rehabilitation Phase 1 The general scope of work for Project No. 2017-668 includes rehabilitation of portions of the existing drainage system on Enterprise Boulevard, including removal and replacement of pipe, pipe bursting, cured-in-place pipe lining (CIPP), and catch basin construction between 12th Street and Broad Street in the City of Lake Charles, Louisiana.
04/03/2018 07:45 PM UTC
Project No. 2017-669 Capital Project No. 3283
Project No. 2017-669 Capital Project No. 3283 Legendre Street Drainage Improvements - Contraband Bayou to McNeese Street Phase One City of Lake Charles, LA ~ The scope of work for Project No. 2017-669 includes installation of approximately 675 linear feet of 8’ x 7’ Reinforced Concrete Box Culverts (RCB) and drainage inlets in the East roadside ditch of Legendre Street starting at the downstream end near Contraband Bayou and proceeding South to the Cell Tower drive (approximately 260 feet South of Badger Drive).
03/06/2018 08:45 PM UTC
Project No. 2016-658, Capital Project No. 3288
Project No. 2016-658 Capital Project No. 3288 48” CIPP Lining from The Holly Hill Road/Prien Lake Road Roundabout North to the Contraband Bayou Lift Station City of Lake Charles, LA ~ The general scope of work for Project No. 2016-658, Capital Project No. 3288, includes the rehabilitation of approximately 2600 feet of 48 inch sewer main by cured-in-place (CIPP) lining from the Holly Hill Road/Prien Lake Road Roundabout North to the Contraband Bayou Lift Station. A system for bypass pumping to manage sewage flow must be furnished and maintained. Manhole tops will require removal and re construction to facilitate liner installation. Concrete and/or brick manholes will also be rehabilitated with new interior liners.
02/20/2018 08:45 PM UTC
251 - 260 of 374 Solicitations
1 2 22 23 24 26 28 29 30 37 38