General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002621-Veterinary Medicine-Domestic Water Line Replacement-Phases 5 and 6
The project consists of, but is not limited to, the extensions to the domestic waterlines and additional piping to facilitate future phases of this project. Provide piping, valves, piping accessories, insulation and other items to complete the system.
06/15/2023 07:01 PM UTC
CP1121905-VMRI Building 62-AHU Modifications
This project includes, but is not limited to, the installation of an additional air handling unit with an outdoor condenser and an exhaust fan system to serve Room 1100.
06/08/2023 07:01 PM UTC
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
06/06/2023 07:01 PM UTC
CP1118617-Barton and Friley Residence Halls-Fire Escape-Repairs
The project consists of, but is not limited to, structural reinforcing and repairs to the existing fire escapes at both the north and south ends of Barton Residence Hall and the existing west fire escape of Friley Residence Hall.
06/06/2023 07:01 PM UTC
CP1000965-Surplus Warehouse
This project includes, but is not limited to, the construction of a new 6,600 sf warehouse, north of the existing Surplus Facility.
06/01/2023 07:01 PM UTC
CP1008443-Family Resource Center-Remodel
This project includes, but is not limited to, the replacement of heating and cooling units.
05/25/2023 07:01 PM UTC
CP1118018-Iowa School for the Deaf-Southeast Parking Lot-Expansion
The project consists of, but is not limited to, pavement removal, grading, subgrade prep, 6 inch PCC pavement, 5 inch PCC sidewalk, and site lighting at Iowa School for the Deaf in Council Bluffs, Iowa.
05/23/2023 07:01 PM UTC
CP942796-Beyer Hall-Room 2500-Remodel
The project consists of, but is not limited to, demolition of partial raised floor; installation of new raised floor, stairs, and ramp; new electrical; and renovation of existing mechanical duct system.
05/11/2023 07:01 PM UTC
CP002632-Kildee Hall-AHU2 and UVU4-Replacement
The project includes, but is not limited to, the replacement of Air Handling Unit (AHU) 2 and Unit Ventilator Unit (UVU) 4 with a semi-custom design unit to serve the west laboratory spaces in the building, new ductwork and pipe reconfiguration, along with improved access and relocation of the existing electrical transformer. Additionally, Mechanical Room M0026 will be prepared for future AHU replacements and improved maintenance access.
05/11/2023 07:01 PM UTC
CP942926-Science Hall-Rooms 0102 & 0152-Ventilation Improvements
The project consists of, but is not limited to, the replacement of two air handling units and the installation of two new energy recovery ventilators.
05/04/2023 07:01 PM UTC
101 - 110 of 376 Solicitations
1 2 7 8 9 11 13 14 15 37 38