Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
| 07/19/2022 07:01 PM UTC |
CP002672-Gilman Hall-Accessible Restroom Improvements
The project consists of, but is not limited to, the renovation of existing space on level 1 in Gilman Hall into a new mens restroom including plumbing improvements, electrical improvements and the installation of new lighting.
| 07/14/2022 07:01 PM UTC |
CP941665-Molecular Biology Building-Room 0121-Remodel
The project consists of, but is not limited to, remodeling an existing animal holding room into a laboratory. The project includes replacement of interior finishes, lighting and controls, mechanical system components, plumbing lines, fixed casework, and the addition of a fume hood.
| 06/28/2022 07:01 PM UTC |
CP002721-Administrative Services Building-HVAC System Conversion
The project consists of, but is not limited to, the replacement of the building roof and removal of the underperforming HVAC system from the roof, replacing it with a new mechanical room building, new energy efficient air handling system, and connection to the adjacent campus chilled water system. This project includes removal of the existing HVAC system, connection to the campus chilled water loop, construction of a new two-story mechanical room on the west side of the building, installation of new air handling equipment, cooling coils and associated components, replacement of the existing ASB roof system, relocation of the existing emergency generator. All the work associated with this will require a phased approach and the new system must be operational prior to the removal of the existing HVAC systems.
| 06/23/2022 07:01 PM UTC |
CP2762-Horticulture Research Station-AVES Building
The project consists of, but is not limited to, the materials and labor to construct a wood frame building with metal siding and roofing. The building will be approximately 2240 square feet. The project will include site work and footings excavation. The building will have concrete foundations, a partial concrete floor, metal exterior doors and frames, and eight interior metal doors and frames.
| 06/21/2022 07:01 PM UTC |
CP002760-Lagomarcino Hall-Roof Replacement-Sections C, G, and H
This project will replace roof sections C, G, and H at Lagomarcino Hall. The project includes, but is not limited to, replacement with a new roof designed that has a minimum useful life expectancy of 30 years. Roof insulation will be increased to current energy codes, and the appropriate roof safety systems and equipment will be installed to current University standards. All masonry walls and features above this roofline that tie directly into this system will be repaired, tuck-pointed, or caulked to prevent water infiltration through these critical interfaces.
| 06/07/2022 07:01 PM UTC |
CP942806-Jacobson Athletic Building-Room 2035-Remodel
The project consists of, but is not limited to, demolition of existing flooring, stairs, walls, and doors. Construction of new glass partition walls, raised floor platform, new doors, electrical and mechanical modifications to existing, and new lighting.
| 05/12/2022 07:01 PM UTC |
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance, new main sprinkler piping and valves, and updating the fire detection and alarm system.
| 05/12/2022 07:01 PM UTC |
CP930220-Curtiss Hall-Room 0209C-Remodel
This project includes, but is not limited to, demolition of existing walls, finishes, furniture, and MEP equipment; installation of new walls, doors, frames, ceilings, and finishes for two to three offices; new MEP equipment and lighting to serve new office spaces; and installation of new furnishings.
| 05/10/2022 07:01 PM UTC |
CP002749-Memorial Union-Roof Replacement
The project consists of, but is not limited to, full replacement of roof sections D, F, H, L, M, N, O, P, Q, R, S, T and U.
| 05/05/2022 07:01 PM UTC |