CP1044575-Lloyd Veterinary Medical Center-Pet Cancer Clinic-Remodel and Addition
This project is an addition and renovation to the existing LLoyd Veterinary Medical Center to develop a Comparative Oncology Center. The new pet cancer clinic includes new exams rooms, animal day wards, clinical procedure and support rooms, office spaces,and client waiting areas.
01/20/2026 08:01 PM UTC
CP1278052-State Avenue Warehouse-Roof Replacement
The scope of work includes, but is not limited to, removing existing EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
01/27/2026 08:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP1001298-Helser Residence Hall-Laundry Improvements
The project consists of, but is not limited to, remodel of an existing first floor bathroom into new resident laundry area. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
10/04/2022 07:01 PM UTC
CO002724-Friley Residence Hall-Bathroom Improvements-Stack H
The project consists of, but is not limited to, remodel of bathrooms in Stack H. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
09/13/2022 07:01 PM UTC
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 1 Expansion
This project will construct an addition to Parking Lot 1, west of Friley Hall and south of Martin Residence Hall and realign Sheldon Avenue Extension, west of Town Engineering and Lot 10. The project consists of, but is not limited to, pavement removal, grading, storm drainage, underground and surface detention, PCC paving, communication utilities and lighting.
09/08/2022 07:01 PM UTC
CP002623-Curtiss Hall-Exterior Masonry Repair
The project consists of, but is not limited to, stone repair, stone mortar repointing, joint sealant replacement and masonry cleaning.
08/30/2022 07:01 PM UTC
CP1000416-LIDIF-Boiler System-Replacement
The project consists of, but is not limited to, the replacement of the existing boiler system in the Livestock Infectious Disease Isolation Facility. Work includes replacement of the three existing 1997 boilers, piping installation, combustion air supply, electrical power connections, control wiring connections, and necessary inspections. Boilers are OFCI.
08/30/2022 07:01 PM UTC
CP917722-Dairy Farm-Cow Bedding System Conversion
The project consists of, but is not limited to, the materials and labor to remove the concrete in the lactating cow free stall pens and replacing with new concrete designed for the use of sand bedding.
08/23/2022 07:01 PM UTC
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
07/19/2022 07:01 PM UTC
CP002672-Gilman Hall-Accessible Restroom Improvements
The project consists of, but is not limited to, the renovation of existing space on level 1 in Gilman Hall into a new mens restroom including plumbing improvements, electrical improvements and the installation of new lighting.
07/14/2022 07:01 PM UTC
CP941665-Molecular Biology Building-Room 0121-Remodel
The project consists of, but is not limited to, remodeling an existing animal holding room into a laboratory. The project includes replacement of interior finishes, lighting and controls, mechanical system components, plumbing lines, fixed casework, and the addition of a fume hood.
06/28/2022 07:01 PM UTC
CP002721-Administrative Services Building-HVAC System Conversion
The project consists of, but is not limited to, the replacement of the building roof and removal of the underperforming HVAC system from the roof, replacing it with a new mechanical room building, new energy efficient air handling system, and connection to the adjacent campus chilled water system. This project includes removal of the existing HVAC system, connection to the campus chilled water loop, construction of a new two-story mechanical room on the west side of the building, installation of new air handling equipment, cooling coils and associated components, replacement of the existing ASB roof system, relocation of the existing emergency generator. All the work associated with this will require a phased approach and the new system must be operational prior to the removal of the existing HVAC systems.
06/23/2022 07:01 PM UTC