Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP936596-Veterinary Medicine-Rooms 2401, 2402, 2403, and 2404-Remodel
The project consists of, but is not limited to, remodeling existing meeting rooms with new partition walls, carpet, ceiling tiles, windows, and doors. Also replacing light fixtures, receptacles, and furniture.
| 05/03/2022 07:01 PM UTC |
CP002745-Stephens Auditorium-Roof Replacement-Section A
The project consists of, but is not limited to, installing new fully adhered 90 mil EPDM roof membrane and insulation system over the existing roof membrane and insulation. Provide and install new flashings and roof expansion covers.
| 04/28/2022 07:01 PM UTC |
CP002758-Kildee Hall-Roof Replacement-Section A and B
The project consists of, but is not limited to, replacing the roof system with a more substantial replacement, increasing insulation to current energy codes, and adding the appropriate roof safety systems and equipment.
| 04/26/2022 07:01 PM UTC |
CP919196-Fire Service Storage Building-Demolition
The project consists of, but is not limited to, demolition of selected site facilities and other structures and site restoration including grading and seeding.
| 04/14/2022 07:01 PM UTC |
CP898870-Southeast Recreation Complex-Pavilions
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data. This project will also relocate the weather detection system.
| 03/24/2022 07:01 PM UTC |
CP940361-Johnny Majors Practice Field-Turf Improvements
This project will prepare the northern portion of Johnny Majors Practice Field for a synthetic turf surface to be installed by others. The project consists of, but is not limited to, subdrain, granular subbase, nailer board, laser grading, electrical improvements and associated site upgrades adjacent to the practice field.
| 03/22/2022 07:01 PM UTC |
CP921822-Utilities-Square Lid Vault Top-Replacements
The project consists of, but is not limited to, the replacement of eight (8) existing underground electrical and telecom vault top concrete slabs that have square manhole lids, with new concrete slabs with ISU standard round manhole lids. This project will involve excavating around the central campus electrical/telecom vaults, sidewalk removal and replacement, re-grading around vaults, concrete removal, and new cast-in-place concrete and rebar work.
| 03/03/2022 08:01 PM UTC |
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
| 02/24/2022 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 4
The project consists of, but is not limited to, the replacement of two each 4160-volt Metal clad switchgears, installation of new medium voltage cables, expansion of an existing SCADA control system, installation of 480-volt panels, 120/208-volt panels, 125-volt DC Panels, transfer switches, 480:120/208-volt transformers and associated 600-volt class cables within the Iowa State University Power Plant. Additional work includes the demolition of 2 existing 4160-volt Metal clad switchgears, one 4160-volt metal enclosed switchgear, one 4160-volt Motor Control Center, one 480-volt Motor Control Center and multiple 480-volt and less power panels and associated equipment, raceways and cables. Architectural/Structural work includes, but is not limited to, the construction of two rooms, demolition of two rooms and the infill of a large opening on the first floor of the Power Plant. Mechanical work includes, but is not limited to, the relocation and installation of steam, condensate, chilled water, domestic water, fire protection, and demineralizer piping systems, relocation of steam supplied unit heaters, the replacement of one roof top HVAC unit and the installation of two new air handling units. All work will occur and be scheduled while keeping the Power Plant fully operational.
| 02/08/2022 08:01 PM UTC |
CP002761-Veterinary Medicine-Room 1330-Remodel
This project will remodel an underutilized existing storage space into a kenneling room. This project includes, but is not limited to, reconfiguration of the room layout, finish updates, modification of mechanical equipment, piping, and ductwork, new light fixtures, receptacles, and fire alarm devices.
| 02/03/2022 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.