Upcoming Solicitations

Number Deadline
CP1316832-Veenker Golf Course Grounds-Bridge Number 15 Replacement
This project will replace the existing bridge at Hole 15 of Veenker Golf Course. The scope of work includes, but is not limited to, the construction of a new, Pre-Engineered Steel Truss Recreational trail bridge and connecting cart paths. The new bridge will be located just south of the existing bridge. The existing bridge and portions of the cart path will be removed in their entirety.
10/13/2026 07:01 PM UTC
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
10/22/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
10/29/2026 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP1015970-Human Nutritional Sciences Building-Research Labs-Remodel
The project consists of, but is not limited to, remodel of existing teaching laboratory space to accommodate textile science research laboratories. Work includes demolition of interior space including existing walls, casework, equipment, and finishes. New work includes, but is not limited to, new walls, casework, fume hoods, doors, finishes, and infill of existing wall openings and roof patching to accommodate new mechanical rooftop equipment. Mechanical scope includes new supply and exhaust ductwork, new building automation controls, and new plumbing to support lab equipment in the space. Electrical scope incudes a new panel, new power services to support lab equipment, new lighting, and new fire alarm devices. Fire protection scope includes removal and re-installation of sprinkler piping and heads in the space.
06/15/2023 07:01 PM UTC
CP002621-Veterinary Medicine-Domestic Water Line Replacement-Phases 5 and 6
The project consists of, but is not limited to, the extensions to the domestic waterlines and additional piping to facilitate future phases of this project. Provide piping, valves, piping accessories, insulation and other items to complete the system.
06/15/2023 07:01 PM UTC
CP1121905-VMRI Building 62-AHU Modifications
This project includes, but is not limited to, the installation of an additional air handling unit with an outdoor condenser and an exhaust fan system to serve Room 1100.
06/08/2023 07:01 PM UTC
CP965420-Jack Trice Stadium-Press Box Elevator-Improvements
This project includes, but is not limited to, modernizing the elevator controller, hoisting equipment, and door operations.
06/06/2023 07:01 PM UTC
CP1118617-Barton and Friley Residence Halls-Fire Escape-Repairs
The project consists of, but is not limited to, structural reinforcing and repairs to the existing fire escapes at both the north and south ends of Barton Residence Hall and the existing west fire escape of Friley Residence Hall.
06/06/2023 07:01 PM UTC
CP1000965-Surplus Warehouse
This project includes, but is not limited to, the construction of a new 6,600 sf warehouse, north of the existing Surplus Facility.
06/01/2023 07:01 PM UTC
CP1008443-Family Resource Center-Remodel
This project includes, but is not limited to, the replacement of heating and cooling units.
05/25/2023 07:01 PM UTC
CP1118018-Iowa School for the Deaf-Southeast Parking Lot-Expansion
The project consists of, but is not limited to, pavement removal, grading, subgrade prep, 6 inch PCC pavement, 5 inch PCC sidewalk, and site lighting at Iowa School for the Deaf in Council Bluffs, Iowa.
05/23/2023 07:01 PM UTC
CP942796-Beyer Hall-Room 2500-Remodel
The project consists of, but is not limited to, demolition of partial raised floor; installation of new raised floor, stairs, and ramp; new electrical; and renovation of existing mechanical duct system.
05/11/2023 07:01 PM UTC
CP002632-Kildee Hall-AHU2 and UVU4-Replacement
The project includes, but is not limited to, the replacement of Air Handling Unit (AHU) 2 and Unit Ventilator Unit (UVU) 4 with a semi-custom design unit to serve the west laboratory spaces in the building, new ductwork and pipe reconfiguration, along with improved access and relocation of the existing electrical transformer. Additionally, Mechanical Room M0026 will be prepared for future AHU replacements and improved maintenance access.
05/11/2023 07:01 PM UTC
141 - 150 of 417 Solicitations