General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002761-Veterinary Medicine-Room 1330-Remodel
This project will remodel an underutilized existing storage space into a kenneling room. This project includes, but is not limited to, reconfiguration of the room layout, finish updates, modification of mechanical equipment, piping, and ductwork, new light fixtures, receptacles, and fire alarm devices.
02/03/2022 08:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall, storm sewer, lighting, bike parking and concrete sidewalks.
02/03/2022 08:01 PM UTC
CP002742-Parking Lots B1 and F-Resurfacing and Expansion
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, structural demolition, new asphalt and concrete pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures, piping and subsurface detention, parking lot lighting, pavement markings, concrete retaining wall, compactor enclosure and finish grading/topsoil.
02/01/2022 08:01 PM UTC
CP002736-Utilities-Applied Science Complex-Deaerator Installation
The project consists of, but is not limited to, removal of existing condensate tank, feed pumps, concrete bases and miscellaneous equipment, valves, piping, wiring, and conduit. Also includes installation of a new Owner-furnished deaerator tank and pump units, piping, and electrical work.
02/01/2022 08:01 PM UTC
CP907055-Durham Center-Clean Agent Fire Suppression System-Improvements
The project consists of, but is not limited to, installation of new clean agent fire suppression system to serve data center space. Project also includes limited modifications to double-interlock pre-action system serving space, installation of combination fire/smoke dampers in ductwork serving space, limited architectural modifications, etc. All work associated with fire alarm systems shall be included as part of Bid Alternate #2 or Bid Alternate #3. Refer to Bid Alternate descriptions and documents for additional information.
01/27/2022 08:01 PM UTC
CP002741-Parking Lot G7-RV Parking Construction
The project consists of, but is not limited to, removal of existing site features, erosion control, storm sewer and subdrain, new PCC and recycled asphalt pavement, lighting, RV power hookups, irrigation, electrical systems and equipment enclosure, finish grading/topsoil and sod.
01/25/2022 08:01 PM UTC
CP002741-Parking Lot G7-RV Parking Construction-Worle Creek Bridge
The project consists of, but is not limited to, removal of existing trees, erosion control, PCC sidewalks, lighting, pre-engineered steel truss recreational trail bridge, stream channel modifications, and finish grading.
01/25/2022 08:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Phase 1
The project consists of, but is not limited to, remodel of bathrooms in stacks G and H. The bathrooms will be converted to private, accessible spaces. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
01/20/2022 08:01 PM UTC
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility-Phase 2
The project consists of, but is not limited to, materials and labor to build-out a 3920 square foot work area. This area has all of the under floor utilities installed, has a concrete floor, is in an insulated building enclosure, has drywall ceiling and perimeter walls. The ceiling and walls are not taped or finished. The project shall include constructing interior walls, electrical, mechanical, and plumbing.
01/13/2022 08:01 PM UTC
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues and Seating
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and three foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
01/06/2022 08:01 PM UTC
131 - 140 of 343 Solicitations
1 2 10 11 12 14 16 17 18 34 35