General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1044575-Lloyd Veterinary Medical Center-Pet Cancer Clinic-Remodel and Addition
This project is an addition and renovation to the existing LLoyd Veterinary Medical Center to develop a Comparative Oncology Center. The new pet cancer clinic includes new exams rooms, animal day wards, clinical procedure and support rooms, office spaces,and client waiting areas.
01/20/2026 08:01 PM UTC
CP1278052-State Avenue Warehouse-Roof Replacement
The scope of work includes, but is not limited to, removing existing EPDM roofing and insulation, removing two ventilators, and infilling open areas with roof panels. Install new insulation and EPDM roofing, as well as new flashing at vents and piping. Rework and install a new flashing tie-in to the existing west metal roof.
01/27/2026 08:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP2762-Horticulture Research Station-AVES Building
The project consists of, but is not limited to, the materials and labor to construct a wood frame building with metal siding and roofing. The building will be approximately 2240 square feet. The project will include site work and footings excavation. The building will have concrete foundations, a partial concrete floor, metal exterior doors and frames, and eight interior metal doors and frames.
06/21/2022 07:01 PM UTC
CP002760-Lagomarcino Hall-Roof Replacement-Sections C, G, and H
This project will replace roof sections C, G, and H at Lagomarcino Hall. The project includes, but is not limited to, replacement with a new roof designed that has a minimum useful life expectancy of 30 years. Roof insulation will be increased to current energy codes, and the appropriate roof safety systems and equipment will be installed to current University standards. All masonry walls and features above this roofline that tie directly into this system will be repaired, tuck-pointed, or caulked to prevent water infiltration through these critical interfaces.
06/07/2022 07:01 PM UTC
CP942806-Jacobson Athletic Building-Room 2035-Remodel
The project consists of, but is not limited to, demolition of existing flooring, stairs, walls, and doors. Construction of new glass partition walls, raised floor platform, new doors, electrical and mechanical modifications to existing, and new lighting.
05/12/2022 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance, new main sprinkler piping and valves, and updating the fire detection and alarm system.
05/12/2022 07:01 PM UTC
CP930220-Curtiss Hall-Room 0209C-Remodel
This project includes, but is not limited to, demolition of existing walls, finishes, furniture, and MEP equipment; installation of new walls, doors, frames, ceilings, and finishes for two to three offices; new MEP equipment and lighting to serve new office spaces; and installation of new furnishings.
05/10/2022 07:01 PM UTC
CP002749-Memorial Union-Roof Replacement
The project consists of, but is not limited to, full replacement of roof sections D, F, H, L, M, N, O, P, Q, R, S, T and U.
05/05/2022 07:01 PM UTC
CP002505-Sports Performance Center & Jack Trice Stadium Improvements North-Bergstrom Football Complex-Rooms 2050, 2054, and 2056
The project consists of, but is not limited to, interior demolition of existing metal stud walls and finishes. New construction to include new metal stud walls and finishes, ceilings, lighting, mechanical and new corridor carpeting.
05/05/2022 07:01 PM UTC
CP936596-Veterinary Medicine-Rooms 2401, 2402, 2403, and 2404-Remodel
The project consists of, but is not limited to, remodeling existing meeting rooms with new partition walls, carpet, ceiling tiles, windows, and doors. Also replacing light fixtures, receptacles, and furniture.
05/03/2022 07:01 PM UTC
CP002745-Stephens Auditorium-Roof Replacement-Section A
The project consists of, but is not limited to, installing new fully adhered 90 mil EPDM roof membrane and insulation system over the existing roof membrane and insulation. Provide and install new flashings and roof expansion covers.
04/28/2022 07:01 PM UTC
CP002758-Kildee Hall-Roof Replacement-Section A and B
The project consists of, but is not limited to, replacing the roof system with a more substantial replacement, increasing insulation to current energy codes, and adding the appropriate roof safety systems and equipment.
04/26/2022 07:01 PM UTC
151 - 160 of 379 Solicitations
1 2 12 13 14 16 18 19 20 37 38