CP1316832-Veenker Golf Course Grounds-Bridge Number 15 Replacement
This project will replace the existing bridge at Hole 15 of Veenker Golf Course. The scope of work includes, but is not limited to, the construction of a new, Pre-Engineered Steel Truss Recreational trail bridge and connecting cart paths. The new bridge will be located just south of the existing bridge. The existing bridge and portions of the cart path will be removed in their entirety.
10/13/2026 07:01 PM UTC
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
10/22/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
10/29/2026 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP942926-Science Hall-Rooms 0102 & 0152-Ventilation Improvements
The project consists of, but is not limited to, the replacement of two air handling units and the installation of two new energy recovery ventilators.
05/04/2023 07:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Locations 7 & 8
The project consists of, but is not limited to, remodel of bathrooms in Locations 7 and 8. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
05/02/2023 07:01 PM UTC
CP964890-Sukup Basketball Complex-Rooms 1124 & 1125-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
05/02/2023 07:01 PM UTC
CP964884-Hilton Coliseum-Rooms 0176, 0176A, 0188, and 0188A-Renovation
The project consists of, but is not limited to, demolition of existing finishes and walls; installation of new stud walls, flooring, finishes, and ceilings; new lighting; and modifications to existing mechanical system.
04/27/2023 07:01 PM UTC
CP002646-Beardshear Hall-Chilled Water Line Replacement-Phase 2
This project includes, but is not limited to, the replacement of the main chilled water lines in the basement, installation of additional gate valves to provide for improved zoning of the chilled water service, preparation for the replacement of the risers and returns for the next phase, and relocation of existing cable trays for better access.
04/27/2023 07:01 PM UTC
CP1017470-Memorial Union-Fountain of the Four Seasons-Renovation
The project consists of, but is not limited to, the renovation of the Memorial Union Fountain of the Four Seasons. Salvage and reinstallation of paving system and limestone units, select limestone unit replacements, select plumbing salvage, demolition and reconstruction of concrete structures, mechanical, electrical, and waterproofing systems. Coordination with Owners representative of installation of limestone sculptures and terra cotta units by others.
04/20/2023 07:01 PM UTC
CP1094910-Buchanan Residence Hall-Water Service Piping-Replacement
The project consists of, but is not limited to, new 8 inch Ductile Iron water pipe, remove abandoned utilities, remove and replace PCC sidewalk, and grading with topsoil.
04/13/2023 07:01 PM UTC
CP1088360-Beyer Hall-Swimming Pool-Repairs
The project consists of, but is not limited to, replacement of existing pool steam-to-water heat exchanger and associated piping and controls. Replacement of several manual isolation valves and pipe couplings. Project must be completed by 6:00 a.m. on August 20, 2023.
04/11/2023 07:01 PM UTC
CP1001602-Roberts Residence Hall-Patio Repairs-West
The project consists of, but is not limited to, the repair and replacement of the patio structure, surface, stairs, and railings on the west exterior patio at Roberts Residence Hall. Interior patio walls below the surface will be repointed and waterproofed. The current patio crawlspace will be regraded, filled with geofoam, and topped with a new concrete base and patio surface. New subdrainage, downspouts, and patio surface drains will be connected to the existing storm drain.
03/28/2023 07:01 PM UTC
CP002509-Curtiss Farm-Feed Mill and Grain Science Complex-Sanitary Sewer Extension
The project consists of, but is not limited to, the installation of approximately 2500 feet of sanitary sewer line along State Ave. Work includes a combination of trenchless and trenched installation. Work also includes supplying and installing several manholes.
03/09/2023 08:01 PM UTC