Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
| 08/11/2026 07:01 PM UTC |
|
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
| 08/18/2026 07:01 PM UTC |
|
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
| 08/20/2026 07:01 PM UTC |
|
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
| 08/27/2026 07:01 PM UTC |
|
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
| 09/03/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1001602-Roberts Residence Hall-Patio Repairs-West
The project consists of, but is not limited to, the repair and replacement of the patio structure, surface, stairs, and railings on the west exterior patio at Roberts Residence Hall. Interior patio walls below the surface will be repointed and waterproofed. The current patio crawlspace will be regraded, filled with geofoam, and topped with a new concrete base and patio surface. New subdrainage, downspouts, and patio surface drains will be connected to the existing storm drain.
| 03/28/2023 07:01 PM UTC |
|
CP002509-Curtiss Farm-Feed Mill and Grain Science Complex-Sanitary Sewer Extension
The project consists of, but is not limited to, the installation of approximately 2500 feet of sanitary sewer line along State Ave. Work includes a combination of trenchless and trenched installation. Work also includes supplying and installing several manholes.
| 03/09/2023 08:01 PM UTC |
|
CP1088271-EHSSB-Interior Improvements
This project includes, but is not limited to, architectural, electrical, and interior design work required to replace the existing raised floor system. The existing system furniture will be removed, prior to the new raised floor installation, and reinstalled at completion. New carpet tiles and floor base will also be installed.
| 03/09/2023 08:01 PM UTC |
|
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 10 Expansion
The project consists of, but is not limited to, expansion of Parking Lot 10, located west of Town Engineering Building. The project includes pavement removal, grading, storm drainage utilities, underground storm detention, asphalt paving, asphalt mill and overlay, concrete curb and gutter, sidewalks and lighting.
| 03/07/2023 08:01 PM UTC |
|
CP930111-Veterinary Medicine-Room 1351-Remodel
This project includes, but is not limited to the demolition of the existing interior horse stalls, new LED lighting and electrical outlets, new finishes, including impervious surfaces, floor, walls, and ceiling in specified areas, mechanical upgrades to maintain a minimum required air changes, and biosafety Level 2 Lab requirement in a small portion of the lab.
| 02/23/2023 08:01 PM UTC |
|
CP986875-Frederiksen Court-Building 31-Fire Alarm System Upgrade
The project consists of, but is not limited to, fire alarm system upgrade including replacement of panel and all wiring according to Department of Residence standards and replacement of the apartment devices with addressable devices.
| 02/16/2023 08:01 PM UTC |
|
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
| 02/07/2023 08:01 PM UTC |
|
CP1004288-CYTown-Parking and Infrastructure Improvements
The project consists of, but is not limited to, demolition of existing parking lots A3, A4, B5, B6, C5, C6, D1, D2, D3 and D4 and adjacent drives, soil import, grading, installation of underground utilities (including sanitary sewer, storm sewer, water main, electric and communications), subgrade preparation, PCC paving, HMA paving, parking lot lighting and surface restoration.
| 01/24/2023 08:01 PM UTC |
|
CP898870-Southeast Recreation Complex-Pavilion
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data.
| 12/20/2022 08:01 PM UTC |
|
CP1001237-Forestry Greenhouse-Demolition
The project consists of, but is not limited to, demolition of the remaining Greenhouse structure and selected site facilities. Final site to be restored including grading and seeding. The abatement of all asbestos containing pipe-fitting insulation, glazing/glazing compound, transite wall paneling, and all associated sealants will be complete prior to building demolition.
| 12/20/2022 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.