Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
| 05/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002694-Carver Hall-Classrooms 0002 and 0004-Remodel
The project consists of, but is not limited to, finish updates, reconfiguration of mechanical distribution, and electrical upgrades.
| 06/29/2021 07:01 PM UTC |
CP002648-Iowa School for the Deaf-Long Hall High School-Upgrades
The project consists of, but is not limited to, removal and replacement of existing exterior windows; miscellaneous exterior masonry repair; mechanical, electrical, and life safety upgrades; and new floor and ceiling finishes.
| 06/17/2021 07:01 PM UTC |
CP002671-Utilities-Campus Sidewalk Lighting Improvement Phase 2
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, relocating existing sidewalk poles, installing solar-powered sidewalk lights, and adding/replacing building mounted lights.
| 06/10/2021 07:01 PM UTC |
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
| 06/03/2021 07:01 PM UTC |
CP002683-Jack Trice Stadium-East Gateway Bridge
The project consists of, but is not limited to, the construction of an elevated gateway bridge over South University Boulevard to connect the east concourse of Jack Trice Stadium and game day parking east of South University Boulevard. A sidewalk will be added along the east side of the existing stadium ring road. The existing Reiman Gardens fencing on the north will be continued along the west side of University Boulevard.
| 05/27/2021 07:01 PM UTC |
CP002732-Firemanship Training-ISD Finance Office-Remodel
The project consists of, but is not limited to, interior finish updates, layout alterations, updating the building entry and restroom for ADA compliance, new roof, new LED lighting fixtures and controls, new power receptacles and data jacks, and mechanical infrastructure updates as needed to support the remodel.
| 05/25/2021 07:01 PM UTC |
CP002704-Union Drive Community Center-Dining Services-Grab and Go-Kitchen
The project consists of, but is not limited to, demolition to existing floor, casework and ceilings to allow for a new ductwork shaft. New work includes a new gypsum board wall, shaft wall, and bulkheads; modification of existing casework, tile and acoustical ceilings; finishes and painting; and associated mechanical, electrical, plumbing and telecommunications modifications. See documents for coordination and installation of equipment noted as provided by Owner.
| 05/20/2021 07:01 PM UTC |
CP002719-Parks Library-Room 0199-Remodel
The project consists of, but is not limited to, replacement of the ADA ramp, new wall construction for offices and meeting spaces, finish updates, new lighting, and updates to mechanical, power, and telecommunication systems to support the remodeled space.
| 05/06/2021 07:01 PM UTC |
CP002589-Union Drive Community Center-Marketplace Renovation-Seating Areas
The project consists of, but is not limited to, new flooring, ceilings, wall finishes and electrical lighting.
| 04/27/2021 07:01 PM UTC |
CP002731-National Pan-Hellenic Council Plaza
The project consists of, but is not limited to, installation of poured-in-place concrete plaza and sidewalks, cast stone pillars and benches, lighting, site clearing, and grading.
| 04/15/2021 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.