CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1
This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
| 04/21/2026 07:01 PM UTC |
|
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
| 04/23/2026 07:01 PM UTC |
|
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
| 04/28/2026 07:01 PM UTC |
|
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
| 05/05/2026 07:01 PM UTC |
|
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
| 05/05/2026 07:01 PM UTC |
|
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
| 05/07/2026 07:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP1001298-Helser Residence Hall-Laundry Improvements
The project consists of, but is not limited to, remodel of an existing first floor bathroom into new resident laundry area. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 10/04/2022 07:01 PM UTC |
|
CO002724-Friley Residence Hall-Bathroom Improvements-Stack H
The project consists of, but is not limited to, remodel of bathrooms in Stack H. The bathrooms will be converted from mass, shared bathrooms to private, accessible units. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
| 09/13/2022 07:01 PM UTC |
|
CP002619-Therkildsen Industrial Engineering Building-Parking Lot 1 Expansion
This project will construct an addition to Parking Lot 1, west of Friley Hall and south of Martin Residence Hall and realign Sheldon Avenue Extension, west of Town Engineering and Lot 10. The project consists of, but is not limited to, pavement removal, grading, storm drainage, underground and surface detention, PCC paving, communication utilities and lighting.
| 09/08/2022 07:01 PM UTC |
|
CP002623-Curtiss Hall-Exterior Masonry Repair
The project consists of, but is not limited to, stone repair, stone mortar repointing, joint sealant replacement and masonry cleaning.
| 08/30/2022 07:01 PM UTC |
|
CP1000416-LIDIF-Boiler System-Replacement
The project consists of, but is not limited to, the replacement of the existing boiler system in the Livestock Infectious Disease Isolation Facility. Work includes replacement of the three existing 1997 boilers, piping installation, combustion air supply, electrical power connections, control wiring connections, and necessary inspections. Boilers are OFCI.
| 08/30/2022 07:01 PM UTC |
|
CP917722-Dairy Farm-Cow Bedding System Conversion
The project consists of, but is not limited to, the materials and labor to remove the concrete in the lactating cow free stall pens and replacing with new concrete designed for the use of sand bedding.
| 08/23/2022 07:01 PM UTC |
|
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
| 07/19/2022 07:01 PM UTC |
|
CP002672-Gilman Hall-Accessible Restroom Improvements
The project consists of, but is not limited to, the renovation of existing space on level 1 in Gilman Hall into a new mens restroom including plumbing improvements, electrical improvements and the installation of new lighting.
| 07/14/2022 07:01 PM UTC |
|
CP941665-Molecular Biology Building-Room 0121-Remodel
The project consists of, but is not limited to, remodeling an existing animal holding room into a laboratory. The project includes replacement of interior finishes, lighting and controls, mechanical system components, plumbing lines, fixed casework, and the addition of a fume hood.
| 06/28/2022 07:01 PM UTC |
|
CP002721-Administrative Services Building-HVAC System Conversion
The project consists of, but is not limited to, the replacement of the building roof and removal of the underperforming HVAC system from the roof, replacing it with a new mechanical room building, new energy efficient air handling system, and connection to the adjacent campus chilled water system. This project includes removal of the existing HVAC system, connection to the campus chilled water loop, construction of a new two-story mechanical room on the west side of the building, installation of new air handling equipment, cooling coils and associated components, replacement of the existing ASB roof system, relocation of the existing emergency generator. All the work associated with this will require a phased approach and the new system must be operational prior to the removal of the existing HVAC systems.
| 06/23/2022 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.