General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002731-National Pan-Hellenic Council Plaza
The project consists of, but is not limited to, installation of poured-in-place concrete plaza and sidewalks, cast stone pillars and benches, lighting, site clearing, and grading.
04/15/2021 07:01 PM UTC
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility
The project consists of, but is not limited to, materials and labor to construct a 19,770 square foot turkey research facility. The project shall include the foundation, the structure (either wood or steel), concrete floors, insulated walls and roof, and doors and windows.
04/01/2021 07:01 PM UTC
CP002739-Helser Residence Hall-Exterior Repairs
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
03/25/2021 07:01 PM UTC
CP002658-Union Drive Community Center-Room 240-Dishwasher Replacement
The project consists of, but is not limited to, concrete slab replacement in the dishroom and replacement of associated under slab utilities and replacement of floor, ceiling, and wall finishes. Contractor to install new dishwasher equipment, conveyer systems, and associated equipment components procured by Owner.
03/16/2021 07:01 PM UTC
CP002538-Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
03/04/2021 08:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
03/04/2021 08:01 PM UTC
CP002680-Maple Residence Hall-Fire Alarm System Upgrade
The project consists of, but is not limited to, installation of a new addressable voice fire alarm system to be installed throughout Maple Residence Hall. This includes addressable fire alarm control panel with voice controls, area type smoke and heat detectors, duct mounted smoke detectors, speaker/strobe signal devices, elevator interface controls, elevator disconnect switch, cutting and patching, painting, and other related electrical work. All pathways are to be concealed - no surface mounted pathways will be allowed. Any cutting of drywall will be repaired, patched and painted to a level 5 finish and to match existing wall color. Existing pathways may be used, but are not exhaustive of the work. No substitutions of fire alarm system components will be allowed.
03/02/2021 08:01 PM UTC
CP002723-Iowa School for the Deaf-Pool Dehumidification System-Replacement
The project consists of, but is not limited to, removal and replacement of the existing pool dehumidification system. Contractor is responsible for any required new steel and electrical work.
03/02/2021 08:01 PM UTC
CP002676-Maple Residence Hall-Elevated Walkway Replacement
The project consists of, but is not limited to, demolition of the north and south existing elevated concrete walkways and metal railings, and replacement with new cast-in-place elevated concrete walkways and metal railings at Maple Residence Hall.
02/18/2021 08:01 PM UTC
CP002728-Institutional Roads 2021-Pavement Preservation
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement and placement of new concrete pavement with PCC curb and gutter.
02/18/2021 08:01 PM UTC
161 - 170 of 343 Solicitations
1 2 13 14 15 17 19 20 21 34 35