General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002748-Memorial Union-Great Hall Stage-Renovation
The project consists of, but is not limited to, rigging upgrades, lighting adjustments, and curtain replacement.
10/14/2021 07:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
10/14/2021 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance; new sprinkler piping and valves; and updating the fire detection and alarm system.
09/02/2021 07:01 PM UTC
CP002717-Parks Library-AHU-Replacement
The project consists of, but is not limited to, replacement of Air Handling Unit #1.
08/26/2021 07:01 PM UTC
CP002694-Carver Hall-Classrooms 0002 and 0004-Remodel
The project consists of, but is not limited to, finish updates, reconfiguration of mechanical distribution, and electrical upgrades.
06/29/2021 07:01 PM UTC
CP002648-Iowa School for the Deaf-Long Hall High School-Upgrades
The project consists of, but is not limited to, removal and replacement of existing exterior windows; miscellaneous exterior masonry repair; mechanical, electrical, and life safety upgrades; and new floor and ceiling finishes.
06/17/2021 07:01 PM UTC
CP002671-Utilities-Campus Sidewalk Lighting Improvement Phase 2
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, relocating existing sidewalk poles, installing solar-powered sidewalk lights, and adding/replacing building mounted lights.
06/10/2021 07:01 PM UTC
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
06/03/2021 07:01 PM UTC
CP002683-Jack Trice Stadium-East Gateway Bridge
The project consists of, but is not limited to, the construction of an elevated gateway bridge over South University Boulevard to connect the east concourse of Jack Trice Stadium and game day parking east of South University Boulevard. A sidewalk will be added along the east side of the existing stadium ring road. The existing Reiman Gardens fencing on the north will be continued along the west side of University Boulevard.
05/27/2021 07:01 PM UTC
CP002732-Firemanship Training-ISD Finance Office-Remodel
The project consists of, but is not limited to, interior finish updates, layout alterations, updating the building entry and restroom for ADA compliance, new roof, new LED lighting fixtures and controls, new power receptacles and data jacks, and mechanical infrastructure updates as needed to support the remodel.
05/25/2021 07:01 PM UTC
181 - 190 of 376 Solicitations
1 2 15 16 17 19 21 22 23 37 38