CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002710-Genetics Laboratory and Genetics Poultry Laboratory-Demolition
The project consists of, but is not limited to, demolition of the Genetics Laboratory and Genetics Poultry Laboratory as well as utility abandonment, utility demolition, pavement and sidewalk removal, earth excavation, grading, pavement replacement and lighting. The project is located on the north side of Pammel Drive between Morrill Road and Winlock Road.
| 12/08/2020 08:01 PM UTC |
CP002627-Utilities-Power Plant-Control Room
The project consists of, but is not limited to, infill work, building a control room with a kitchenette, providing work stations, and installing owner-provided LCD screens. Control room will require an HVAC unit and also require some mechanical tie-ins to existing building systems. Electrical wiring and lighting is also included in the scope of work.
| 11/24/2020 08:01 PM UTC |
CP002541-Memorial Union-Floors 4-6-Renovation
The project consists of, but is not limited to, the renovation of approximately 23,400 square feet on the upper three floors in the Memorial Union. Work includes demolition of existing walls, floors and ceilings, removal of mechanical, electrical and fire protection systems. New work includes gypsum board partitions, finishes, and painting and associated mechanical, electrical, plumbing and telecommunications modifications.
| 11/12/2020 08:01 PM UTC |
CP002706-Institutional Roads 2021-University Boulevard and Haber Road-Signal Replacement
The project consists of, but is not limited to, replacement of the existing traffic signals with new signals that meet current traffic control standards and pavement work at the intersection of University Boulevard and Haber Road on the Iowa State University campus. Scope of work includes new traffic signals, associated hardware and all underground raceways and cables, roadway pavement modifications, new sidewalks, ADA complaint ramps and pavement striping.
| 10/29/2020 07:01 PM UTC |
CP002214-BioCentury Research Farm-Vehicle Dynamometer Facility-Electrical Improvements
The project consists of, but is not limited to, materials and labor to increase the electrical service for the operation of a new vehicle dynamometer in an existing building. The project includes new 2500 amp service, switchboard, and disconnect.
| 10/29/2020 07:01 PM UTC |
CP002604-Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
| 10/22/2020 07:01 PM UTC |
CP002697-Bessey Hall-Rooms 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
| 10/13/2020 07:01 PM UTC |
CP002697 - Bessey Hall-Room 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
| 10/08/2020 06:01 PM UTC |
CP002713 - Gilman Hall-AHU15 and AHU16-Coil Replacement
The project consists of, but is not limited to, new coils and associated work for the replacement of the pre-heat and by-pass coils for air handling units 15 and 16.
| 09/22/2020 07:01 PM UTC |
CP002714 - Molecular Biology Building-AHU7-Coil Replacement
The project consists of, but is not limited to, the replacement of the existing heating coil and associated steam piping and accessories in AHU#7 with a new heating coil, move and replace components such as louvers, dampers and filter racks as required to bring the new heating coils into the building. Project includes all related mechanical work as indicated on the contract documents to support the project scope defined above and shown in the contract documents.
| 09/15/2020 07:01 PM UTC |