General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1300581-Memorial Union-Roof Sections B, C, G, J, K, W, Z and 1 Replacement
MEMORIAL UNION-ROOF REPLACEMENT-SECTIONS G, Z, 1 This project will replace Memorial Union roof sections G, Z, and 1. The scope of work includes, but is not limited to, demolishing existing roof systems and replacing them with new roofing systems.
04/21/2026 07:01 PM UTC
CP1289859-Beardshear Hall-Rooms 0530, 0810, 0880, 3410 Improvement
Scope for Accounts Receivable, ID Card Office, Treasury, and a shared space in 3410 Beardshear for Accounts Receivable and Financial Aid. Accounts Receivable 0810 Beardshear: Reconfigure space to accommodate the ID Card Office 0810A: Reconfigure current Conference Room into two workstations and a small kitchenette 0810C: Reconfigure current office into two work stations to support ID Card 0880: Reconfigure AR Front Office to move kitchenette out and add small student workstations 0530 Beardshear: Remodel current card office for Treasury space 3410 Beardshear: Update paint and carpet, in addition to office furniture for 3410A, 3410C to allow for shared workspace offices
04/23/2026 07:01 PM UTC
CP1275129-Linden Residence Hall-North Retaining Wall-Repairs
This project will repair and replace segments of the retaining wall and replace stairs on the north side of Linden Residence Hall. The scope of work includes, but is not limited to, retaining wall footing and masonry replacement, site lighting, concrete stairs, sidewalk replacement, landscaping, and site drainage improvements. An accessible pedestrian and equipment access route will be provided to the plaza level.
04/28/2026 07:01 PM UTC
CP1303287-Student Services Building-East Wing Ground Floor Remodel
This project will remodel multiple rooms, hallways and stairwells in the East Wing of the Student Services Building. The scope of work includes, but is not limited to, patching and painting; new flooring; new upper and lower cabinets; new furniture, tables, and chairs; new cabinetry; and new carpet and blinds.
05/05/2026 07:01 PM UTC
CP1311894-Veterinary Medical Research Institute Animal Holding #40-85kW Generator Replacement
This project will replace the existing 85kW indoor open-frame natural gas generator in VMRI 40 with a similarly sized outdoor natural gas generator with weather and sound-insulated housing. The scope of work includes installing a concrete pad, removing and replacing the generator, and reconfiguring all related electrical connections to meet current codes. Patch and repair the existing hole, and grade and seed.
05/05/2026 07:01 PM UTC
CP1289132-Reiman Gardens Conservatory-Boilers-Replacement
This project will remove and replace four existing boilers; increase the size of existing concrete curbs to support new equipment; install a new domestic water heat exchanger and all associated electrical, plumbing, and gas piping to complete the work.
05/07/2026 07:01 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CP919196-Fire Service Storage Building-Demolition
The project consists of, but is not limited to, demolition of selected site facilities and other structures and site restoration including grading and seeding.
04/14/2022 07:01 PM UTC
CP898870-Southeast Recreation Complex-Pavilions
The project consists of, but is not limited to, constructing a pavilion style shelter at the Southeast Recreation Complex. The pavilion will consist of a metal roof, concrete slab, metal columns, power, and data. This project will also relocate the weather detection system.
03/24/2022 07:01 PM UTC
CP940361-Johnny Majors Practice Field-Turf Improvements
This project will prepare the northern portion of Johnny Majors Practice Field for a synthetic turf surface to be installed by others. The project consists of, but is not limited to, subdrain, granular subbase, nailer board, laser grading, electrical improvements and associated site upgrades adjacent to the practice field.
03/22/2022 07:01 PM UTC
CP921822-Utilities-Square Lid Vault Top-Replacements
The project consists of, but is not limited to, the replacement of eight (8) existing underground electrical and telecom vault top concrete slabs that have square manhole lids, with new concrete slabs with ISU standard round manhole lids. This project will involve excavating around the central campus electrical/telecom vaults, sidewalk removal and replacement, re-grading around vaults, concrete removal, and new cast-in-place concrete and rebar work.
03/03/2022 08:01 PM UTC
CP923004-Utilities-Pearson Substation-13.8kV Feeder Cable Replacement
The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations.
02/24/2022 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 4
The project consists of, but is not limited to, the replacement of two each 4160-volt Metal clad switchgears, installation of new medium voltage cables, expansion of an existing SCADA control system, installation of 480-volt panels, 120/208-volt panels, 125-volt DC Panels, transfer switches, 480:120/208-volt transformers and associated 600-volt class cables within the Iowa State University Power Plant. Additional work includes the demolition of 2 existing 4160-volt Metal clad switchgears, one 4160-volt metal enclosed switchgear, one 4160-volt Motor Control Center, one 480-volt Motor Control Center and multiple 480-volt and less power panels and associated equipment, raceways and cables. Architectural/Structural work includes, but is not limited to, the construction of two rooms, demolition of two rooms and the infill of a large opening on the first floor of the Power Plant. Mechanical work includes, but is not limited to, the relocation and installation of steam, condensate, chilled water, domestic water, fire protection, and demineralizer piping systems, relocation of steam supplied unit heaters, the replacement of one roof top HVAC unit and the installation of two new air handling units. All work will occur and be scheduled while keeping the Power Plant fully operational.
02/08/2022 08:01 PM UTC
CP002761-Veterinary Medicine-Room 1330-Remodel
This project will remodel an underutilized existing storage space into a kenneling room. This project includes, but is not limited to, reconfiguration of the room layout, finish updates, modification of mechanical equipment, piping, and ductwork, new light fixtures, receptacles, and fire alarm devices.
02/03/2022 08:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall, storm sewer, lighting, bike parking and concrete sidewalks.
02/03/2022 08:01 PM UTC
CP002742-Parking Lots B1 and F-Resurfacing and Expansion
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, structural demolition, new asphalt and concrete pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures, piping and subsurface detention, parking lot lighting, pavement markings, concrete retaining wall, compactor enclosure and finish grading/topsoil.
02/01/2022 08:01 PM UTC
CP002736-Utilities-Applied Science Complex-Deaerator Installation
The project consists of, but is not limited to, removal of existing condensate tank, feed pumps, concrete bases and miscellaneous equipment, valves, piping, wiring, and conduit. Also includes installation of a new Owner-furnished deaerator tank and pump units, piping, and electrical work.
02/01/2022 08:01 PM UTC
181 - 190 of 399 Solicitations