General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP2762-Horticulture Research Station-AVES Building
The project consists of, but is not limited to, the materials and labor to construct a wood frame building with metal siding and roofing. The building will be approximately 2240 square feet. The project will include site work and footings excavation. The building will have concrete foundations, a partial concrete floor, metal exterior doors and frames, and eight interior metal doors and frames.
06/21/2022 07:01 PM UTC
CP002760-Lagomarcino Hall-Roof Replacement-Sections C, G, and H
This project will replace roof sections C, G, and H at Lagomarcino Hall. The project includes, but is not limited to, replacement with a new roof designed that has a minimum useful life expectancy of 30 years. Roof insulation will be increased to current energy codes, and the appropriate roof safety systems and equipment will be installed to current University standards. All masonry walls and features above this roofline that tie directly into this system will be repaired, tuck-pointed, or caulked to prevent water infiltration through these critical interfaces.
06/07/2022 07:01 PM UTC
CP942806-Jacobson Athletic Building-Room 2035-Remodel
The project consists of, but is not limited to, demolition of existing flooring, stairs, walls, and doors. Construction of new glass partition walls, raised floor platform, new doors, electrical and mechanical modifications to existing, and new lighting.
05/12/2022 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance, new main sprinkler piping and valves, and updating the fire detection and alarm system.
05/12/2022 07:01 PM UTC
CP930220-Curtiss Hall-Room 0209C-Remodel
This project includes, but is not limited to, demolition of existing walls, finishes, furniture, and MEP equipment; installation of new walls, doors, frames, ceilings, and finishes for two to three offices; new MEP equipment and lighting to serve new office spaces; and installation of new furnishings.
05/10/2022 07:01 PM UTC
CP002749-Memorial Union-Roof Replacement
The project consists of, but is not limited to, full replacement of roof sections D, F, H, L, M, N, O, P, Q, R, S, T and U.
05/05/2022 07:01 PM UTC
CP002505-Sports Performance Center & Jack Trice Stadium Improvements North-Bergstrom Football Complex-Rooms 2050, 2054, and 2056
The project consists of, but is not limited to, interior demolition of existing metal stud walls and finishes. New construction to include new metal stud walls and finishes, ceilings, lighting, mechanical and new corridor carpeting.
05/05/2022 07:01 PM UTC
CP936596-Veterinary Medicine-Rooms 2401, 2402, 2403, and 2404-Remodel
The project consists of, but is not limited to, remodeling existing meeting rooms with new partition walls, carpet, ceiling tiles, windows, and doors. Also replacing light fixtures, receptacles, and furniture.
05/03/2022 07:01 PM UTC
CP002745-Stephens Auditorium-Roof Replacement-Section A
The project consists of, but is not limited to, installing new fully adhered 90 mil EPDM roof membrane and insulation system over the existing roof membrane and insulation. Provide and install new flashings and roof expansion covers.
04/28/2022 07:01 PM UTC
CP002758-Kildee Hall-Roof Replacement-Section A and B
The project consists of, but is not limited to, replacing the roof system with a more substantial replacement, increasing insulation to current energy codes, and adding the appropriate roof safety systems and equipment.
04/26/2022 07:01 PM UTC
181 - 190 of 409 Solicitations