Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002698 - Gilman Hall-Office and Lab Space-Remodel
The project consists of, but is not limited to, power and mechanical system modifications, finish and lighting updates, and casework replacement.
| 09/03/2020 07:01 PM UTC |
CP002699 - Food Sciences Building-AHU1 Coil-Replacement
The project consists of, but is not limited to, replacement of existing heating coil, air blender, and filter rack in air handler AHU1 with new heating coil, air blender, and filter rack. All replacement components in air handler will be shifted slightly from their current location to a new location further downstream. Work also includes relocation of existing steam condensate receiving tank and pumps and removal of existing electrical transformer serving AHU1 supply fan.
| 09/01/2020 07:01 PM UTC |
CP002631 - Parks Library-Sprinkler System Modifications
The project consists of, but is not limited to piping revisions, riser modifications, and zone valve relocations to address and prevent future system deficiencies.
| 08/27/2020 07:01 PM UTC |
CP002674 - Veterinary Medicine-Roof Replacement-Section E
The project consists of, but is not limited to, removal of existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM membrane roof system. Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
| 08/27/2020 07:01 PM UTC |
CP002637 - Utilities-Hilton Coliseum-High Voltage Feeder Replacement
The project consists of, but is not limited to, demolition and reconstruction of an existing electrical high voltage vault with energized cables, concrete and asphalt demolition and replacement, conduit trench excavation, installation of underground concrete encased PVC conduits, concrete core drills, and installation of RGS conduits in an unexcavated area inside Hilton Coliseum.
| 08/20/2020 07:01 PM UTC |
CP002657 - Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 2500 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters, food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
| 08/18/2020 07:01 PM UTC |
CP002591 - Ross Hall-First Floor Restrooms-Remodel
This project is the complete renovation of the first floor restrooms in Ross Hall to create accessible toilet facilities. The work consists of, but is not limited to, the replacement of toilets, sinks, partitions, door assemblies, ceilings, flooring, lighting, and power door operators.
| 08/13/2020 07:01 PM UTC |
CP002592-Science Hall 2-First Floor Restrooms-Remodel
The project consists of, but is not limited to, replacement of sinks, toilets, partitions, and installation of power door operators to make the first floor restrooms in Science Hall II accessible.
| 08/06/2020 07:01 PM UTC |
CP002466 - Utilities-Power Plant-Station Power Improvements-Phase 2
The project consists of, but is not limited to, installation of ridged steel conduit and high voltage cable bored from one existing underground electrical vault to another. Additional work includes the energization and testing of the high voltage cable and breaker.
| 07/02/2020 07:01 PM UTC |
CP002656 - Memorial Union-Dining Services-Gelato Store
The project consists of, but is not limited to, renovation of 600 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment. Finish upgrades to include new tile flooring, wall & ceiling finishes, and two new security grilles. Demolition and installation of new plumbing, mechanical, electrical, telecommunications, and fire protection to support the renovated space.
| 06/25/2020 07:01 PM UTC |