CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
05/13/2025 07:01 PM UTC
CP1259884-Stephens Auditorium-Utility Lines-Repair
This project will make corrections to certain sanitary drains currently tied-in to the storm sewer system. The scope of work includes, but is not limited to, permanently sealing or rerouting drains from an electrical room, two mechanical rooms, and one air handling unit.
05/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 1
The project consists of, but is not limited to, expanding the existing 4160 volt electrical substation located south of the General Services Building to accommodate a new 8.4 MVA transformer, 13,800 volt switchgear, a high voltage feeder cable from Haber Road substation to service the new transformer and switchgear and high voltage feeder cables from the new transformer to the existing 4160 volt switchgear along with new underground raceway systems. Site work includes the removal of the existing site masonry enclosure, construction of new footings and enclosure walls, relocation of an existing underground water main, replacement of a section of stream tunnel roof and replacement of affected roadway and parking lot pavement.
02/11/2021 08:01 PM UTC
CP002657-Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 250 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
02/09/2021 08:01 PM UTC
CP002582-Parks Library-South Window System-Repairs
The project consists of, but is not limited to, replacement of curtainwall components outside of the structural back members including glazing, entrance door replacement, and interior finish repairs as a result of water intrusion damage.
01/28/2021 08:01 PM UTC
CP002610-Utilities-Power Plant-Boiler Makeup System Improvements
The project consists of, but is not limited to, installation of Owner-furnished water treatment equipment, controls, electrical, and interconnecting piping as well as demolition of interior walls.
01/28/2021 08:01 PM UTC
CP002730-Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 2
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
01/21/2021 08:01 PM UTC
CP002723-Iowa School for the Deaf-Pool Dehumidification System-Replacement
The project consists of, but is not limited to, removal and replacement of the existing pool dehumidification system. Contractor is responsible for any required new steel and electrical work.
01/14/2021 08:01 PM UTC
CP002636-Enrollment Services Center-Roof Replacement
The project consists of the replacement of the tile roof, skylight, gutters, copper flashing, copper collection boxes, and copper downspouts on the gambrel roof at the Enrollment Services Building. In addition, replacement of the membrane roofs on the three porches, tuckpointing of brick as shown on the drawings, cleaning of stone ornamentation, and repairs and painting of wood trim.
12/17/2020 08:01 PM UTC
CP002225-Student Innovation Center-Dust Collection System
The project consists of, but is not limited to, installation of a new dust collection system serving the level 1 fabrication space in the Student Innovation Center. Work requires selective demolition, installation of a full dust collection system including controls, fire suppression, compressed air, and all other items to support the full system, and integration with existing building systems.
12/17/2020 08:01 PM UTC
CP002675-Veterinary Medicine-Roof Replacement-Sections 3 and 4
The project consists of, but is not limited to, removal of the existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM roof membrane roof (base bid) or PVC roof membrane (alternate #1). Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
12/15/2020 08:01 PM UTC
CP002710-Genetics Laboratory and Genetics Poultry Laboratory-Demolition
The project consists of, but is not limited to, demolition of the Genetics Laboratory and Genetics Poultry Laboratory as well as utility abandonment, utility demolition, pavement and sidewalk removal, earth excavation, grading, pavement replacement and lighting. The project is located on the north side of Pammel Drive between Morrill Road and Winlock Road.
12/08/2020 08:01 PM UTC