General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP907055-Durham Center-Clean Agent Fire Suppression System-Improvements
The project consists of, but is not limited to, installation of new clean agent fire suppression system to serve data center space. Project also includes limited modifications to double-interlock pre-action system serving space, installation of combination fire/smoke dampers in ductwork serving space, limited architectural modifications, etc. All work associated with fire alarm systems shall be included as part of Bid Alternate #2 or Bid Alternate #3. Refer to Bid Alternate descriptions and documents for additional information.
01/27/2022 08:01 PM UTC
CP002741-Parking Lot G7-RV Parking Construction
The project consists of, but is not limited to, removal of existing site features, erosion control, storm sewer and subdrain, new PCC and recycled asphalt pavement, lighting, RV power hookups, irrigation, electrical systems and equipment enclosure, finish grading/topsoil and sod.
01/25/2022 08:01 PM UTC
CP002741-Parking Lot G7-RV Parking Construction-Worle Creek Bridge
The project consists of, but is not limited to, removal of existing trees, erosion control, PCC sidewalks, lighting, pre-engineered steel truss recreational trail bridge, stream channel modifications, and finish grading.
01/25/2022 08:01 PM UTC
CP002724-Friley Residence Hall-Bathroom Improvements-Phase 1
The project consists of, but is not limited to, remodel of bathrooms in stacks G and H. The bathrooms will be converted to private, accessible spaces. The work includes mechanical, electrical, and plumbing system modifications, interior finish updates, and layout changes.
01/20/2022 08:01 PM UTC
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility-Phase 2
The project consists of, but is not limited to, materials and labor to build-out a 3920 square foot work area. This area has all of the under floor utilities installed, has a concrete floor, is in an insulated building enclosure, has drywall ceiling and perimeter walls. The ceiling and walls are not taped or finished. The project shall include constructing interior walls, electrical, mechanical, and plumbing.
01/13/2022 08:01 PM UTC
CP002589-Union Drive Community Center-Union Drive Marketplace-Renovation-Venues and Seating
The project consists of, but is not limited to, renovation of interior finishes and equipment in seating area and three foodservice venues in the Union Drive Community Center. Upgrades include polishing of existing concrete flooring, wall and ceiling finishes, replacement of existing doors, new cooking and foodservice equipment, plumbing improvements, electrical power improvements, and installation of new lighting.
01/06/2022 08:01 PM UTC
CP913244-Institutional Roads 2022-Pavement Preservation-Union Drive
The project consists of, but is not limited to, removal and replacement of concrete pavement, concrete sidewalks, reconstruction of storm sewer structure, new and relocated roadway and sidewalk lighting, pavement markings and finish grading.
12/16/2021 08:01 PM UTC
CP002650-Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
12/14/2021 08:01 PM UTC
CP002669-College of Design-Room 0101-Renovation
The project consists of, but is not limited to, demolition of framed walls and concrete risers; construction of new pipe enclosure walls; removal and replacement of flooring, seating, and rubber stair tread/risers; painting; drop ceiling tile replacement; and minor electrical work.
12/09/2021 08:01 PM UTC
CP002747-Memorial Union-Soults Family Visitor Center-Remodel
This project will expand and remodel the existing Soults Family Visitor Center to improve the campus visitor experience. The project consists of, but is not limited to, expanded office spaces; updated finishes; new technology, equipment, and furniture; and restroom modernization.
11/18/2021 08:01 PM UTC
201 - 210 of 409 Solicitations
1 2 17 18 19 21 23 24 25 40 41