Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002690-Armory-Interior Northwest Corner-Remodel
The project consists of, but is not limited to, finish updates; lighting, power, and mechanical system upgrades; and space reconfiguration.
| 06/23/2020 07:01 PM UTC |
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
| 06/18/2020 07:01 PM UTC |
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
| 06/04/2020 07:01 PM UTC |
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
| 05/28/2020 07:01 PM UTC |
CP002620 - Applied Science 2-Roof Replacement-Section E
This project includes, but is not limited to, removal of the existing ballasted roof system down to the existing insulation, adding new insulation to achieve energy code requirements, installation of backer board and a new 90 mil EPDM membrane roof system. Alternate work scope includes installation of ballasted safety guardrail.
| 05/07/2020 07:01 PM UTC |
CP002665 - Frederiksen Court-Roof Replacements
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, and downspouts and removal and replacement of plywood sheathing as needed on nine buildings in Frederiksen Court.
| 04/09/2020 07:01 PM UTC |
CP002650 - Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
| 04/07/2020 07:01 PM UTC |
CP002684 - Extension Information Technology Building-Demolition
The project consists of, but is not limited to, demolition of the Extension Information Technology Building as well as utility abandonment, utility demolition, parking lot pavement removal, and site grading.
| 04/07/2020 07:01 PM UTC |
CP002666 - Schilletter Village-Roof Replacements FY20
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, soffit panels and metal fascia; installation of roof ventilation; and replacement of plywood sheathing as needed on twenty buildings in Schilletter Village.
| 04/02/2020 07:01 PM UTC |
CP002669 - College of Design-Room 0101-Renovation
The project consists of, but is not limited to, demolition of framed walls and concrete risers; construction of new pipe enclosure walls; removal and replacement of flooring, seating, and rubber stair tread/risers; painting; drop ceiling tile replacement; and minor electrical work.
| 03/31/2020 07:01 PM UTC |