General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
07/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002214-BioCentury Research Farm-Vehicle Dynamometer Facility-Electrical Improvements
The project consists of, but is not limited to, materials and labor to increase the electrical service for the operation of a new vehicle dynamometer in an existing building. The project includes new 2500 amp service, switchboard, and disconnect.
10/29/2020 07:01 PM UTC
CP002604-Parking Lots 2020-Pavement Preservation-Richardson Court
The project consists of, but is not limited to, removal of existing concrete and asphalt pavement, new asphalt pavement with concrete curb and gutter, concrete sidewalks, storm sewer structures and piping, water main installation, sanitary sewer installation, medium voltage electrical and power service to Linden Hall, parking lot and sidewalk lighting, subsurface detention, pavement markings and finish grading.
10/22/2020 07:01 PM UTC
CP002697-Bessey Hall-Rooms 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/13/2020 07:01 PM UTC
CP002697 - Bessey Hall-Room 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/08/2020 06:01 PM UTC
CP002713 - Gilman Hall-AHU15 and AHU16-Coil Replacement
The project consists of, but is not limited to, new coils and associated work for the replacement of the pre-heat and by-pass coils for air handling units 15 and 16.
09/22/2020 07:01 PM UTC
CP002714 - Molecular Biology Building-AHU7-Coil Replacement
The project consists of, but is not limited to, the replacement of the existing heating coil and associated steam piping and accessories in AHU#7 with a new heating coil, move and replace components such as louvers, dampers and filter racks as required to bring the new heating coils into the building. Project includes all related mechanical work as indicated on the contract documents to support the project scope defined above and shown in the contract documents.
09/15/2020 07:01 PM UTC
CP002698 - Gilman Hall-Office and Lab Space-Remodel
The project consists of, but is not limited to, power and mechanical system modifications, finish and lighting updates, and casework replacement.
09/03/2020 07:01 PM UTC
CP002699 - Food Sciences Building-AHU1 Coil-Replacement
The project consists of, but is not limited to, replacement of existing heating coil, air blender, and filter rack in air handler AHU1 with new heating coil, air blender, and filter rack. All replacement components in air handler will be shifted slightly from their current location to a new location further downstream. Work also includes relocation of existing steam condensate receiving tank and pumps and removal of existing electrical transformer serving AHU1 supply fan.
09/01/2020 07:01 PM UTC
CP002631 - Parks Library-Sprinkler System Modifications
The project consists of, but is not limited to piping revisions, riser modifications, and zone valve relocations to address and prevent future system deficiencies.
08/27/2020 07:01 PM UTC
CP002674 - Veterinary Medicine-Roof Replacement-Section E
The project consists of, but is not limited to, removal of existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM membrane roof system. Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
08/27/2020 07:01 PM UTC
211 - 220 of 369 Solicitations
1 2 18 19 20 22 24 25 26 36 37