CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002483-Barton Residence Hall-Window Replacement
The project consists of, but is not limited to, the replacement of approximately 118 windows.
02/27/2020 08:01 PM UTC
CP002617 - Beyer Hall-Rooms 1312 and 1316-Renovation
The project consists of, but is not limited to, the demolition of two existing recreational squash court interiors and renovating the existing space into a recreational electronic sports and gaming computer lab.
02/20/2020 08:01 PM UTC
CP002606 - Agricultural Engineering & Agronomy Farm-Plant Pathology Machine Storage Building
The project consists of, but is not limited to, materials and labor to construct a 6000 square feet equipment storage building. The building will be post-frame construction with metal siding and roofing. The building will be uninsulated and have a rock floor.
02/13/2020 08:01 PM UTC
CP002538 - Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, flat seam metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
02/13/2020 08:01 PM UTC
CP002595 - Helser Residence Hall-Tuckpointing
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
02/04/2020 08:01 PM UTC
CP002624-Insectary, Genetics Storage, and Chick Isolation-Demolition
The project consists of, but is not limited to, the demolition of the Insectary, Genetics Storage, and Chick Isolation buildings at Iowa State University. Work also includes utility abandonment, utility demolition, steam tunnel removal, pavement and sidewalk removals, excavation, grading, lighting and replacement of pavement and sidewalks.
01/23/2020 08:01 PM UTC
CP002536 - Molecular Biology Building-Rooms 0112 and 0114-Remodel
The project consists of, but is not limited to, the conversion of two existing wet laboratories into space for a new electron microscope. Work includes, but is not limited to, interior demolition of the existing laboratories and construction of new walls, door, and interior finishes. Additional work includes modification of the sprinkler and ventilation systems, and installation of new lighting and electrical connections for new equipment.
12/12/2019 08:01 PM UTC
CP002605 - University Compost Facility-Soil Storage Building
The project consists of, but is not limited to, materials and labor for the installation of a pre-engineered open sided steel building with concrete floor and aprons.
12/05/2019 08:01 PM UTC
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
11/21/2019 08:01 PM UTC
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.