Upcoming Solicitations

Number Deadline
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
07/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002637 - Utilities-Hilton Coliseum-High Voltage Feeder Replacement
The project consists of, but is not limited to, demolition and reconstruction of an existing electrical high voltage vault with energized cables, concrete and asphalt demolition and replacement, conduit trench excavation, installation of underground concrete encased PVC conduits, concrete core drills, and installation of RGS conduits in an unexcavated area inside Hilton Coliseum.
08/20/2020 07:01 PM UTC
CP002657 - Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 2500 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters, food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
08/18/2020 07:01 PM UTC
CP002591 - Ross Hall-First Floor Restrooms-Remodel
This project is the complete renovation of the first floor restrooms in Ross Hall to create accessible toilet facilities. The work consists of, but is not limited to, the replacement of toilets, sinks, partitions, door assemblies, ceilings, flooring, lighting, and power door operators.
08/13/2020 07:01 PM UTC
CP002592-Science Hall 2-First Floor Restrooms-Remodel
The project consists of, but is not limited to, replacement of sinks, toilets, partitions, and installation of power door operators to make the first floor restrooms in Science Hall II accessible.
08/06/2020 07:01 PM UTC
CP002466 - Utilities-Power Plant-Station Power Improvements-Phase 2
The project consists of, but is not limited to, installation of ridged steel conduit and high voltage cable bored from one existing underground electrical vault to another. Additional work includes the energization and testing of the high voltage cable and breaker.
07/02/2020 07:01 PM UTC
CP002656 - Memorial Union-Dining Services-Gelato Store
The project consists of, but is not limited to, renovation of 600 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment. Finish upgrades to include new tile flooring, wall & ceiling finishes, and two new security grilles. Demolition and installation of new plumbing, mechanical, electrical, telecommunications, and fire protection to support the renovated space.
06/25/2020 07:01 PM UTC
CP002690-Armory-Interior Northwest Corner-Remodel
The project consists of, but is not limited to, finish updates; lighting, power, and mechanical system upgrades; and space reconfiguration.
06/23/2020 07:01 PM UTC
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
06/18/2020 07:01 PM UTC
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
06/04/2020 07:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
05/28/2020 07:01 PM UTC