General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316832-Veenker Golf Course Grounds-Bridge Number 15 Replacement
This project will replace the existing bridge at Hole 15 of Veenker Golf Course. The scope of work includes, but is not limited to, the construction of a new, Pre-Engineered Steel Truss Recreational trail bridge and connecting cart paths. The new bridge will be located just south of the existing bridge. The existing bridge and portions of the cart path will be removed in their entirety.
10/13/2026 07:01 PM UTC
CP1323911-Power Plant-Mechanical Room 0125 Remodel
This project will repurpose the containment area of the Water Treatment Equipment room in the Power Plant into a work and coordination space for the plumbers and pipefitters. Work includes building interior walls and roof, moving existing plumbing and electrical, installing a new sink, outlets, lights, casework, and a ventilator.
10/22/2026 07:01 PM UTC
CP1248808-Lake LaVerne-Improvements-Bridge and Amphitheater
This project includes, but is not limited to, a 10 foot wide PCC pedestrian, outdoor amphitheater limestone block seating, lakebed grading, shoreline grading and restoration, PCC sidewalks and site lighting.
10/29/2026 07:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
10/19/2021 07:01 PM UTC
CP002748-Memorial Union-Great Hall Stage-Renovation
The project consists of, but is not limited to, rigging upgrades, lighting adjustments, and curtain replacement.
10/14/2021 07:01 PM UTC
CP002663-Farm House Lane-Reconstruction
The project consists of, but is not limited to, reconstruction and widening of Farm House Lane from Parking Lot 49 to Troxel Hall. Also included is construction of storm sewer facilities, water main relocation, steam tunnel top and wall replacement, lighting, reconstruction of pedestrian facilities and bicycle parking.
10/14/2021 07:01 PM UTC
CP002630-General Services Building-Sprinkler System Installation
The project consists of, but is not limited to, modifications to the water service entrance; new sprinkler piping and valves; and updating the fire detection and alarm system.
09/02/2021 07:01 PM UTC
CP002717-Parks Library-AHU-Replacement
The project consists of, but is not limited to, replacement of Air Handling Unit #1.
08/26/2021 07:01 PM UTC
CP002694-Carver Hall-Classrooms 0002 and 0004-Remodel
The project consists of, but is not limited to, finish updates, reconfiguration of mechanical distribution, and electrical upgrades.
06/29/2021 07:01 PM UTC
CP002648-Iowa School for the Deaf-Long Hall High School-Upgrades
The project consists of, but is not limited to, removal and replacement of existing exterior windows; miscellaneous exterior masonry repair; mechanical, electrical, and life safety upgrades; and new floor and ceiling finishes.
06/17/2021 07:01 PM UTC
CP002671-Utilities-Campus Sidewalk Lighting Improvement Phase 2
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, relocating existing sidewalk poles, installing solar-powered sidewalk lights, and adding/replacing building mounted lights.
06/10/2021 07:01 PM UTC
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
06/03/2021 07:01 PM UTC
CP002683-Jack Trice Stadium-East Gateway Bridge
The project consists of, but is not limited to, the construction of an elevated gateway bridge over South University Boulevard to connect the east concourse of Jack Trice Stadium and game day parking east of South University Boulevard. A sidewalk will be added along the east side of the existing stadium ring road. The existing Reiman Gardens fencing on the north will be continued along the west side of University Boulevard.
05/27/2021 07:01 PM UTC
221 - 230 of 417 Solicitations
1 2 … 19 20 21 23 25 26 27 … 41 42