General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002734-Applied Science Complex 4-Renovation
The project consists of, but is not limited to, mechanical and electrical upgrades to an existing single story metal building. Mechanical scope includes new unitary heating and cooling equipment and ductwork, new dust collector, and updates to existing building automation system to support new equipment. Electrical scope includes new electrical transformer and panel, new lighting, and new fire alarm panel. Scope of work includes replacement of existing interior doors with rated doors and modifications to existing gypsum walls to meet fire rating requirements.
06/03/2021 07:01 PM UTC
CP002683-Jack Trice Stadium-East Gateway Bridge
The project consists of, but is not limited to, the construction of an elevated gateway bridge over South University Boulevard to connect the east concourse of Jack Trice Stadium and game day parking east of South University Boulevard. A sidewalk will be added along the east side of the existing stadium ring road. The existing Reiman Gardens fencing on the north will be continued along the west side of University Boulevard.
05/27/2021 07:01 PM UTC
CP002732-Firemanship Training-ISD Finance Office-Remodel
The project consists of, but is not limited to, interior finish updates, layout alterations, updating the building entry and restroom for ADA compliance, new roof, new LED lighting fixtures and controls, new power receptacles and data jacks, and mechanical infrastructure updates as needed to support the remodel.
05/25/2021 07:01 PM UTC
CP002704-Union Drive Community Center-Dining Services-Grab and Go-Kitchen
The project consists of, but is not limited to, demolition to existing floor, casework and ceilings to allow for a new ductwork shaft. New work includes a new gypsum board wall, shaft wall, and bulkheads; modification of existing casework, tile and acoustical ceilings; finishes and painting; and associated mechanical, electrical, plumbing and telecommunications modifications. See documents for coordination and installation of equipment noted as provided by Owner.
05/20/2021 07:01 PM UTC
CP002719-Parks Library-Room 0199-Remodel
The project consists of, but is not limited to, replacement of the ADA ramp, new wall construction for offices and meeting spaces, finish updates, new lighting, and updates to mechanical, power, and telecommunication systems to support the remodeled space.
05/06/2021 07:01 PM UTC
CP002589-Union Drive Community Center-Marketplace Renovation-Seating Areas
The project consists of, but is not limited to, new flooring, ceilings, wall finishes and electrical lighting.
04/27/2021 07:01 PM UTC
CP002731-National Pan-Hellenic Council Plaza
The project consists of, but is not limited to, installation of poured-in-place concrete plaza and sidewalks, cast stone pillars and benches, lighting, site clearing, and grading.
04/15/2021 07:01 PM UTC
CP002490-Poultry Farm-Teaching and Research Facilities-Turkey Facility
The project consists of, but is not limited to, materials and labor to construct a 19,770 square foot turkey research facility. The project shall include the foundation, the structure (either wood or steel), concrete floors, insulated walls and roof, and doors and windows.
04/01/2021 07:01 PM UTC
CP002739-Helser Residence Hall-Exterior Repairs
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
03/25/2021 07:01 PM UTC
CP002658-Union Drive Community Center-Room 240-Dishwasher Replacement
The project consists of, but is not limited to, concrete slab replacement in the dishroom and replacement of associated under slab utilities and replacement of floor, ceiling, and wall finishes. Contractor to install new dishwasher equipment, conveyer systems, and associated equipment components procured by Owner.
03/16/2021 07:01 PM UTC
221 - 230 of 409 Solicitations
1 2 19 20 21 23 25 26 27 40 41