General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002697 - Bessey Hall-Room 0001, 0003 and 0305-Remodel
The project consists of, but is not limited to, the demolition and remodeling of multiple areas within Bessey Hall, including portions of the existing basement and a research lab on the third floor. Work includes demolition of existing walls, doors, finishes and lab furnishings, equipment and MEP systems associated with multiple lab spaces. Architectural work includes new walls, doors, frames, patching and painting, new fixed equipment, new environmental chambers and upgrades to the MEP systems.
10/08/2020 06:01 PM UTC
CP002713 - Gilman Hall-AHU15 and AHU16-Coil Replacement
The project consists of, but is not limited to, new coils and associated work for the replacement of the pre-heat and by-pass coils for air handling units 15 and 16.
09/22/2020 07:01 PM UTC
CP002714 - Molecular Biology Building-AHU7-Coil Replacement
The project consists of, but is not limited to, the replacement of the existing heating coil and associated steam piping and accessories in AHU#7 with a new heating coil, move and replace components such as louvers, dampers and filter racks as required to bring the new heating coils into the building. Project includes all related mechanical work as indicated on the contract documents to support the project scope defined above and shown in the contract documents.
09/15/2020 07:01 PM UTC
CP002698 - Gilman Hall-Office and Lab Space-Remodel
The project consists of, but is not limited to, power and mechanical system modifications, finish and lighting updates, and casework replacement.
09/03/2020 07:01 PM UTC
CP002699 - Food Sciences Building-AHU1 Coil-Replacement
The project consists of, but is not limited to, replacement of existing heating coil, air blender, and filter rack in air handler AHU1 with new heating coil, air blender, and filter rack. All replacement components in air handler will be shifted slightly from their current location to a new location further downstream. Work also includes relocation of existing steam condensate receiving tank and pumps and removal of existing electrical transformer serving AHU1 supply fan.
09/01/2020 07:01 PM UTC
CP002631 - Parks Library-Sprinkler System Modifications
The project consists of, but is not limited to piping revisions, riser modifications, and zone valve relocations to address and prevent future system deficiencies.
08/27/2020 07:01 PM UTC
CP002674 - Veterinary Medicine-Roof Replacement-Section E
The project consists of, but is not limited to, removal of existing ballasted roof system down to the existing asphaltic built up roof layer. Installation of new insulation and fully adhered 90 mil EPDM membrane roof system. Removal and reinstallation of metal flashings, disconnection and reconnection of equipment as needed, extension of curbs and new walk pads.
08/27/2020 07:01 PM UTC
CP002637 - Utilities-Hilton Coliseum-High Voltage Feeder Replacement
The project consists of, but is not limited to, demolition and reconstruction of an existing electrical high voltage vault with energized cables, concrete and asphalt demolition and replacement, conduit trench excavation, installation of underground concrete encased PVC conduits, concrete core drills, and installation of RGS conduits in an unexcavated area inside Hilton Coliseum.
08/20/2020 07:01 PM UTC
CP002657 - Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 2500 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters, food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
08/18/2020 07:01 PM UTC
CP002591 - Ross Hall-First Floor Restrooms-Remodel
This project is the complete renovation of the first floor restrooms in Ross Hall to create accessible toilet facilities. The work consists of, but is not limited to, the replacement of toilets, sinks, partitions, door assemblies, ceilings, flooring, lighting, and power door operators.
08/13/2020 07:01 PM UTC
221 - 230 of 376 Solicitations