Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
| 11/11/2025 08:01 PM UTC |
| Number | Deadline |
|---|---|
|
CP002592-Science Hall 2-First Floor Restrooms-Remodel
The project consists of, but is not limited to, replacement of sinks, toilets, partitions, and installation of power door operators to make the first floor restrooms in Science Hall II accessible.
| 08/06/2020 07:01 PM UTC |
|
CP002466 - Utilities-Power Plant-Station Power Improvements-Phase 2
The project consists of, but is not limited to, installation of ridged steel conduit and high voltage cable bored from one existing underground electrical vault to another. Additional work includes the energization and testing of the high voltage cable and breaker.
| 07/02/2020 07:01 PM UTC |
|
CP002656 - Memorial Union-Dining Services-Gelato Store
The project consists of, but is not limited to, renovation of 600 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment. Finish upgrades to include new tile flooring, wall & ceiling finishes, and two new security grilles. Demolition and installation of new plumbing, mechanical, electrical, telecommunications, and fire protection to support the renovated space.
| 06/25/2020 07:01 PM UTC |
|
CP002690-Armory-Interior Northwest Corner-Remodel
The project consists of, but is not limited to, finish updates; lighting, power, and mechanical system upgrades; and space reconfiguration.
| 06/23/2020 07:01 PM UTC |
|
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
| 06/18/2020 07:01 PM UTC |
|
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
| 06/04/2020 07:01 PM UTC |
|
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
| 05/28/2020 07:01 PM UTC |
|
CP002620 - Applied Science 2-Roof Replacement-Section E
This project includes, but is not limited to, removal of the existing ballasted roof system down to the existing insulation, adding new insulation to achieve energy code requirements, installation of backer board and a new 90 mil EPDM membrane roof system. Alternate work scope includes installation of ballasted safety guardrail.
| 05/07/2020 07:01 PM UTC |
|
CP002665 - Frederiksen Court-Roof Replacements
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, and downspouts and removal and replacement of plywood sheathing as needed on nine buildings in Frederiksen Court.
| 04/09/2020 07:01 PM UTC |
|
CP002650 - Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
| 04/07/2020 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.