General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
12/05/2024 08:01 PM UTC
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
12/19/2024 08:01 PM UTC
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
12/19/2024 08:01 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
11/19/2019 08:01 PM UTC
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
11/14/2019 08:01 PM UTC
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
10/22/2019 07:01 PM UTC
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
10/17/2019 07:01 PM UTC
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
10/17/2019 07:01 PM UTC
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
10/03/2019 07:01 PM UTC
CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
09/05/2019 07:01 PM UTC
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
09/05/2019 07:01 PM UTC
CP002585 - National Swine Research and Information Center-Sprinkler System Modifications
The project consists of, but is not limited to, replacing all standard response sprinkler heads with quick response sprinkler heads, upsizing the cross mains, and modifying the main service.
08/27/2019 07:01 PM UTC
CP002551 - Lagomarcino Hall-Southwest Wing-Remodel
The project consists of, but is not limited to, space reconfiguration, new lighting, finish modernization, and minor HVAC modifications.
08/01/2019 07:01 PM UTC
231 - 240 of 343 Solicitations
1 2 20 21 22 24 26 27 28 34 35