CP1264621-Hamilton Hall-Roof Replacement
This project will remove and replace existing roofs at Hamilton Hall with a new 90mil membrane roof. The scope of work includes, but is not limited to, removal of existing roof, new insulation, vapor barrier, membrane, and coping flashing metals.
11/11/2025 08:01 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
CP002592-Science Hall 2-First Floor Restrooms-Remodel
The project consists of, but is not limited to, replacement of sinks, toilets, partitions, and installation of power door operators to make the first floor restrooms in Science Hall II accessible.
08/06/2020 07:01 PM UTC
CP002466 - Utilities-Power Plant-Station Power Improvements-Phase 2
The project consists of, but is not limited to, installation of ridged steel conduit and high voltage cable bored from one existing underground electrical vault to another. Additional work includes the energization and testing of the high voltage cable and breaker.
07/02/2020 07:01 PM UTC
CP002656 - Memorial Union-Dining Services-Gelato Store
The project consists of, but is not limited to, renovation of 600 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment. Finish upgrades to include new tile flooring, wall & ceiling finishes, and two new security grilles. Demolition and installation of new plumbing, mechanical, electrical, telecommunications, and fire protection to support the renovated space.
06/25/2020 07:01 PM UTC
CP002690-Armory-Interior Northwest Corner-Remodel
The project consists of, but is not limited to, finish updates; lighting, power, and mechanical system upgrades; and space reconfiguration.
06/23/2020 07:01 PM UTC
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
06/18/2020 07:01 PM UTC
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
06/04/2020 07:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
05/28/2020 07:01 PM UTC
CP002620 - Applied Science 2-Roof Replacement-Section E
This project includes, but is not limited to, removal of the existing ballasted roof system down to the existing insulation, adding new insulation to achieve energy code requirements, installation of backer board and a new 90 mil EPDM membrane roof system. Alternate work scope includes installation of ballasted safety guardrail.
05/07/2020 07:01 PM UTC
CP002665 - Frederiksen Court-Roof Replacements
The project consists of, but is not limited to, removal and replacement of the shingles, ice and water shield, gutters, and downspouts and removal and replacement of plywood sheathing as needed on nine buildings in Frederiksen Court.
04/09/2020 07:01 PM UTC
CP002650 - Carver Hall-Room 0101-Renovation
The project consists of, but is not limited to, removal and replacement of flooring and seating, painting, lighting, acoustical wall panel installation, handrails and minor electrical work.
04/07/2020 07:01 PM UTC