General Info

Business Logo

Iowa State University

700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
07/08/2025 07:01 PM UTC
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
07/22/2025 07:01 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CP002583-Veterinary Medicine-Fish Tank Lobby
The project consists of, but is not limited to, terrazzo flooring replacement; mechanical and electrical modifications, and new finishes throughout.
03/24/2020 07:01 PM UTC
CP002584 - Veterinary Medicine-Classroom 2532-Expansion
The project consists of, but is not limited to, structural modifications; mechanical, electrical, and technology upgrades; and modernized finishes.
03/19/2020 07:01 PM UTC
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
03/17/2020 07:01 PM UTC
CP002638 - Jack Trice Stadium-Field Renovation
The project consists of, but is not limited to, removal and off-site hauling of existing root zone materials, finish grading, sod installation and irrigation system adjustments. Contractor shall provide all incidental materials and equipment to install to specifications the system shown in the construction documents.
03/12/2020 07:01 PM UTC
CP002645-Utilities-P Tunnel Chilled Water Main-Replacement
The project consists of, but is not limited to installation of new sections of 20” HDPE chilled water lines under Lincoln Way south of Larch Residence Hall by directional drilling, connection to existing 14” ductile iron lines, and removal and replacement of existing pavement in the small drive south of Larch Residence Hall.
03/10/2020 07:01 PM UTC
CP002505-Sports Performance Center and Jack Trice Stadium Improvements North-Jacobson and Concourse
The project consists of, but is not limited to, remodeling within the existing Jacobson Building, demolition of the existing Olsen Building, constructing a new concourse and connection bridge, and stadium hillside upgrades. Work includes concrete foundations, steel structure, precast concrete, metal wall panels, glazing, PVC roofing, CMU, metal stud framing, interior glazing, interior finishes, mechanical, and electrical systems.
03/05/2020 08:01 PM UTC
CP002483-Barton Residence Hall-Window Replacement
The project consists of, but is not limited to, the replacement of approximately 118 windows.
02/27/2020 08:01 PM UTC
CP002617 - Beyer Hall-Rooms 1312 and 1316-Renovation
The project consists of, but is not limited to, the demolition of two existing recreational squash court interiors and renovating the existing space into a recreational electronic sports and gaming computer lab.
02/20/2020 08:01 PM UTC
CP002606 - Agricultural Engineering & Agronomy Farm-Plant Pathology Machine Storage Building
The project consists of, but is not limited to, materials and labor to construct a 6000 square feet equipment storage building. The building will be post-frame construction with metal siding and roofing. The building will be uninsulated and have a rock floor.
02/13/2020 08:01 PM UTC
CP002538 - Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, flat seam metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
02/13/2020 08:01 PM UTC
241 - 250 of 369 Solicitations
1 2 21 22 23 25 27 28 29 36 37