Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002617 - Beyer Hall-Rooms 1312 and 1316-Renovation
The project consists of, but is not limited to, the demolition of two existing recreational squash court interiors and renovating the existing space into a recreational electronic sports and gaming computer lab.
| 02/20/2020 08:01 PM UTC |
CP002606 - Agricultural Engineering & Agronomy Farm-Plant Pathology Machine Storage Building
The project consists of, but is not limited to, materials and labor to construct a 6000 square feet equipment storage building. The building will be post-frame construction with metal siding and roofing. The building will be uninsulated and have a rock floor.
| 02/13/2020 08:01 PM UTC |
CP002538 - Friley Residence Hall-Roof Replacement
The project consists of, but is not limited to, roof shingle replacement, membrane roof replacement, flat seam metal roof, and new dormer windows. See drawings for slate shingle and window abatement removals by others.
| 02/13/2020 08:01 PM UTC |
CP002595 - Helser Residence Hall-Tuckpointing
The project consists of, but is not limited to, tuckpointing, exterior insulation finish system replacement, and masonry cleaning and repair.
| 02/04/2020 08:01 PM UTC |
CP002624-Insectary, Genetics Storage, and Chick Isolation-Demolition
The project consists of, but is not limited to, the demolition of the Insectary, Genetics Storage, and Chick Isolation buildings at Iowa State University. Work also includes utility abandonment, utility demolition, steam tunnel removal, pavement and sidewalk removals, excavation, grading, lighting and replacement of pavement and sidewalks.
| 01/23/2020 08:01 PM UTC |
CP002536 - Molecular Biology Building-Rooms 0112 and 0114-Remodel
The project consists of, but is not limited to, the conversion of two existing wet laboratories into space for a new electron microscope. Work includes, but is not limited to, interior demolition of the existing laboratories and construction of new walls, door, and interior finishes. Additional work includes modification of the sprinkler and ventilation systems, and installation of new lighting and electrical connections for new equipment.
| 12/12/2019 08:01 PM UTC |
CP002605 - University Compost Facility-Soil Storage Building
The project consists of, but is not limited to, materials and labor for the installation of a pre-engineered open sided steel building with concrete floor and aprons.
| 12/05/2019 08:01 PM UTC |
CP002622 - Zaffarano Physics Addition-Fan Coil Replacement-Phase 4
The project consists of, but is not limited to, the removal and replacement of fourteen (14) fan coil units and accessories and other work as detailed in the documents. Complete installation per each unit(s) in a single room to be completed in three (3) work days. This installation of new unit and accessories, insulation of piping, ductwork, and completion of control work. Moving and reinstallation of furniture or equipment by Owner, Contractor to coordinate.
| 11/21/2019 08:01 PM UTC |
CP002614 - Bessey Hall-Rooms 0150 & 0153-Remodel
The project consists of, but is not limited to, new carpet and finishes; new corridor glazing; and electrical and mechanical upgrades.
| 11/19/2019 08:01 PM UTC |
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Concrete
The project consists of, but is not limited to, the demolition of the concrete floor in an existing building, digging an equipment pit, and installation of the concrete pit with footing drainage to house a vehicle dynamometer.
| 11/19/2019 08:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.