Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002440 - Utilities-Applied Science 1-Electrical Service Replacement
The project consists of, but is not limited to, installing a new secondary 480 volt electrical service from an exterior padmount City of Ames transformer to interior room in building basement, boring a 4” PVC conduit to overhead power pole, installing new service entrance main breaker switchboard, and refeeding the existing 1600A main-tie-main switchboard. Project also includes electrical grounding work, existing pipe demolition in basement mechanical room, new utility metering, transformer concrete pad installation, and provide new light fixtures.
| 08/01/2019 07:01 PM UTC |
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
| 07/30/2019 07:01 PM UTC |
CP002540 - Veterinary Medicine-Field Services Building-Expansion
The project consists of, but is not limited to, the construction of a new building addition including foundations, building shell, interior finishes, doors, HVAC, and utilities on the north side of the existing Field Services Building. Also included is some interior renovation including restrooms.
| 07/25/2019 07:01 PM UTC |
CP002214 - Agricultural Engineering & Agronomy Farm-Vehicle Dynamometer Facility
The project consists of, but is not limited to, the construction of a new building including foundations, building shell, equipment pit, doors, electrical service entrance to house a vehicle dynamometer.
| 07/11/2019 07:01 PM UTC |
CP002562 - Veterinary Medicine-Domestic Water Line Replacement-Phase 4
The project consists of, but is not limited to, the extensions to the domestic water service and additional piping to facilitate future domestic water line replacement work. Provide piping, valves, piping accessories, insulation, and other items required to complete the system.
| 07/11/2019 07:01 PM UTC |
CP002505 - Town Engineering Building-Roof Replacement and Strobic Extension
(NOTE: CORRECT CP NUMBER IS CP002550)
The project consists of, but is not limited to, tear-off of approximately 45,660 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90 mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping and laboratory vent piping. Mechanical work includes extension of the existing strobic exhaust duct, installation of piping, and final connections to existing laboratory hoods. Removal of any roof mounted equipment no longer necessary after the strobic connection is complete.
| 07/09/2019 07:01 PM UTC |
CP002553 - Utilities-Switchgear Vault 39 Replacement
The project consists of, but is not limited to, construction of one underground cast-in-place electrical vault, repair walls of an existing underground electrical vault, installation of new electrical medium voltage cable and conduit, supporting and working around energized medium voltage cable and equipment, and installation of 600V conduit, wire, and ground boxes.
| 06/25/2019 07:01 PM UTC |
CP002576 - College of Design-Common Area Enhancements
The project consists of, but is not limited to, the patching and painting of the five-story atrium and central stair of the College of Design, as well as cleaning of the atrium side of the faculty windows located on the south side of the atrium.
| 06/25/2019 07:01 PM UTC |
CP002505 - Sports Performance Center and Jack Trice Stadium Improvements North-Sports Performance Center
The project consists of, but is not limited to, new construction for a 4-story plus basement, 98,626 sf Sports Performance Center. New construction for a single-story plus mezzanine, 13,832 sf West Bergstrom addition. Remodeling to the existing Bergstrom Facility, 18,827 sf with associated utility, building systems, site, and landscape work. Work includes concrete foundations, drilled piers, steel structure, precast concrete, metal wall panels, glazed curtain walls, PVC roofing, metal roofing panels, CMU, metal stud framing, interior glazing, interior finishes, lockers, kitchen equipment, mechanical, and electrical systems.
| 06/20/2019 07:01 PM UTC |
CP002589 - Union Drive Community Center-Union Drive Marketplace Renovation
The project consists of, but is not limited to, interior renovations of the mezzanine dining space and a conference room at the Union Drive Community Center Building.
| 06/18/2019 07:01 PM UTC |