Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1253073-Communications Building-Suite 1200-Remodel
This project will remodel approximately 4,100 GSF in Communications Building Suite 1200, including rooms 1211, 1226, and 1227. Work includes, but is not limited to, demolition, construction, mechanical and electrical improvements, paint, carpet, lighting, and furniture.
| 05/13/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002558 - East Hall-Exterior Envelope Repairs
The project consists of, but is not limited to, clean and repair exterior brick, repair damaged stone, paint lintels, paint soffits, and remove and replace asphalt shingle roof system with new asphalt shingle system.
| 11/14/2019 08:01 PM UTC |
CP002601 - BioCentury Research Farm-Site Drainage Improvements
The project consists of, but is not limited to, materials and labor for the installation of a storm sewer system and regrading of existing gravel lots.
| 10/22/2019 07:01 PM UTC |
CP002405 - Parking Lots-LED Lighting Upgrades
The project consists of, but is not limited to, replacing 309 old parking lot light fixtures with new, more efficient, LED light fixtures.
| 10/17/2019 07:01 PM UTC |
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
| 10/17/2019 07:01 PM UTC |
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
| 10/03/2019 07:01 PM UTC |
CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
| 09/05/2019 07:01 PM UTC |
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
| 09/05/2019 07:01 PM UTC |
CP002585 - National Swine Research and Information Center-Sprinkler System Modifications
The project consists of, but is not limited to, replacing all standard response sprinkler heads with quick response sprinkler heads, upsizing the cross mains, and modifying the main service.
| 08/27/2019 07:01 PM UTC |
CP002551 - Lagomarcino Hall-Southwest Wing-Remodel
The project consists of, but is not limited to, space reconfiguration, new lighting, finish modernization, and minor HVAC modifications.
| 08/01/2019 07:01 PM UTC |
CP002440 - Utilities-Applied Science 1-Electrical Service Replacement
The project consists of, but is not limited to, installing a new secondary 480 volt electrical service from an exterior padmount City of Ames transformer to interior room in building basement, boring a 4” PVC conduit to overhead power pole, installing new service entrance main breaker switchboard, and refeeding the existing 1600A main-tie-main switchboard. Project also includes electrical grounding work, existing pipe demolition in basement mechanical room, new utility metering, transformer concrete pad installation, and provide new light fixtures.
| 08/01/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.