Iowa State University
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
700 Wallace Rd Gen Serv/Room 200, Ames, IA 50011-4012
(515) 294-0366
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
CP1191717-General Services Building-AHU12-Replacement
This project includes but is not limited to the replacement of Air Handling Unit 12 (AHU12), including associated plumbing, ductwork, electrical service, insulation, and controls. This unit provides heating, cooling, and limited ventilation to several workspaces.
| 12/05/2024 08:01 PM UTC |
CP002466-Utilities-Power Plant-Station Power Improvements-Phase 5
THIS PROJECT WILL REPLACE AND RECONFIGURE THE STATION POWER SYSTEM WITHIN THE UNIVERSITY POWER PLANT. THE STATION POWER SYSTEM CONSISTS OF THE INTERNAL 15,000 AND 5,000 VOLT SWITCHGEAR, INTERNAL SUBSTATIONS, 480 VOLT LOAD CENTERS, MOTOR CONTROL CENTERS, AND ESSENTIAL POWER SYSTEMS. THE PROJECT WILL TAKE PLACE IN MULTIPLE PHASES OVER MULTIPLE YEARS IN ORDER TO MAINTAIN PLANT OPERATIONS.
| 12/19/2024 08:01 PM UTC |
CP1250785-Beyer Hall-Swimming Pool Repairs-Phase 2
This project includes, but is not limited to, repairs to the existing Beyer Hall swimming pool equipment. Work includes capping the surge tank to prevent chloramine gas from entering the equipment room, and the replacement of the above-ground pool piping, circulation and drain pumps, and the sand filtration system.
| 12/19/2024 08:01 PM UTC |
Number | Deadline |
---|---|
CP002533 - Meats Laboratory-Roof Replacement-Sections A-I
The project consists of, but is not limited to, tear-off of approximately 29,220 SF of existing ballasted EPDM, rigid insulation, flashings and sheet metal trim. Roof replacement will be with a fully adhered low-slope roof system consisting of fully adhered tapered rigid insulation with fully adhered 90-mil EPDM roof system. Other work includes metal deck patching, wood blocking, pre-finished sheet metal copings, flashings, sealants, fall protection guardrails, painting, roof drain piping, and vent piping.
| 06/13/2019 07:01 PM UTC |
CP002510 - Heady Hall-Electrical Panel and Utility Safety Improvements-Phase 1
The project consists of, but is not limited to, furnishing all materials, labor, tools, expendable equipment, utility and transportation services, and all incidental items required for scope of work.
| 06/13/2019 07:01 PM UTC |
CP002565 - Institutional Roads 2019-Pavement Preservation
The project consists of, but is not limited to, removal and replacement of PCC pavement, curb & gutter, storm sewer piping, storm intake, sidewalks and accessible ramps.
| 06/13/2019 07:01 PM UTC |
CP002556 - Johnny Majors Practice Field-Expansion
The project consists of, but is not limited to, the expansion of Johnny Majors Practice Field 35 feet to the east. This requires stripping the top organics from the existing field, removing the existing top 3” of sand and relocating to the east to create a new 10” sand profile. Scope also includes demolition of the existing east chain-link fence and installing new fence; grading from the new field edge to the new parkway; modifications to the existing irrigation system; and installation of subdrain.
| 06/06/2019 07:01 PM UTC |
CP002567-Molecular Biology Building-Common Area Improvements
The project consists of, but is not limited to, cleaning, painting, carpeting, refinishing wood benches, masonry block and tile repair, and lighting upgrades.
| 05/30/2019 07:01 PM UTC |
CP002571 - Lied Recreation Athletic Facility-Gasket Replacement
The project includes, but is not limited to, deepening grooves in the existing hydronic piping that is outside of tolerance limits and replacing existing couplings, valves, and flanges.
| 05/14/2019 07:01 PM UTC |
CP002559 - Carver Hall-Rooms 0129, 0131, 0150, 0171, and 0173 Remodel
The project consists of, but is not limited to, remodeling existing classroom and office space into new office and interview space.
| 04/25/2019 07:01 PM UTC |
CP002581 - Utilities-Maple Steam Vault-Expansion
The project consists of, but is not limited to, expanding the structure of existing vault located west of Maple Residence Hall, rerouting steam and condensate lines, installation of new vault lighting, and installation of sump pump.
| 04/25/2019 07:01 PM UTC |
CP002504 - Beyer Hall-Room 1451 Remodel
The project consists of, but is not limited to, work associated with creating two new offices; walls, doors, carpet tile and epoxy flooring, and new ceiling tile. Mechanical work includes new Air Handler, ductwork, and diffusers. Electrical includes new light fixtures, receptacles, and data jacks.
| 04/23/2019 07:01 PM UTC |
CP002549 - Lagomarcino Hall-Rooms W0081, W0079, and C0077W Remodel
The project consists of remodeling existing department space and two corridors and work includes, but is not limited to, ceiling and flooring replacement; lighting, mechanical, and electrical upgrades; new casework, paint, and furniture.