CP1316880-Pearson Hall-Rooms 1116 and 1138 Remodel
This project allows for a large workshop and meeting space for students and staff in Room 1116. Office space, smaller workshop spaces, and open collaboration spaces will be created for students and staff in Room 1138. The scope of work includes, but is not limited to architectural changes to enlarge spaces, furniture placement in meeting and collaboration spaces, and AV, mechanical, and electrical work as needed.
08/11/2026 07:01 PM UTC
CP1318745-Gilman Hall-Rooms 1105 & 1109 Remodel
This project will remodel approximately 1,270 gross square feet of office space in rooms 1105, 1109, and 1109A of Gilman Hall. Work consists of demolition of interior space, including existing ceiling, mini-blinds, casework, window A/C units, and light fixtures. New work will include new flooring, roll shades, ceiling, furniture, light fixtures, and updated mechanical and electrical work to support the remodel.
08/18/2026 07:01 PM UTC
CP1313140-Biorenewables Complex Research Laboratory-Room 1115 Improvement
This project will create space for 2 hydrotreaters in the Biorenewables Research Laboratory. The scope of work includes, but is not limited to, structural support of the floor, architectural work to add a roll-up door, and mechanical and electrical work.
08/20/2026 07:01 PM UTC
CP1297497-Food Sciences Building-Rooms 2592, 2594, and 2951 Remodel
This project will remodel rooms 2592, 2594, and 2951 in Food Sciences Building. The scope of work incudes: Room 2951: Remove the existing cabinets, countertops, ceiling, lighting, flooring, and the Ansell fire suppression hood and system. Install stainless steel counters from the Health Nutrition Science Building, along with new vinyl flooring, lay-in gypsum ceiling, new lighting, sinks, dishwashers, an icemaker, mop sink, new hoods, ductwork, and walls will be patched and painted. Room 2592: Remove existing testing millwork, ceiling, flooring, sprinklers, diffusers, lights and switches. Install new acoustical ceiling, sheet vinyl flooring, patch and repaint walls, diffusers, new color changing lights, power for a TV, chairs and movable desks. Room 2594: Remove, flooring, sprinklers, diffusers, lights and switches. New sheet vinyl flooring, patch and repaint walls and ceiling, sound seals for doors, diffusers, exhaust and make-up air for odor control, and new lighting with dimming and color control.
08/27/2026 07:01 PM UTC
CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade
This project will replace the Pearson 4.16kV Substation gear along with medium voltage cabling in order to increase capacity and reliability. The scope of work includes, but is not limited to: demolishing existing switchgear and medium voltage cabling; purchasing and installing new switchgear and cable; and performing commission testing on the newly installed gear and cable. Additionally, support from our High Voltage (HV) Electricians will be required to perform terminations at the new gear and existing switches.
09/03/2026 07:01 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
CP002637 - Utilities-Hilton Coliseum-High Voltage Feeder Replacement
The project consists of, but is not limited to, demolition and reconstruction of an existing electrical high voltage vault with energized cables, concrete and asphalt demolition and replacement, conduit trench excavation, installation of underground concrete encased PVC conduits, concrete core drills, and installation of RGS conduits in an unexcavated area inside Hilton Coliseum.
08/20/2020 07:01 PM UTC
CP002657 - Memorial Union-Dining Services-Poco Picante-Remodel
The project consists of, but is not limited to, renovation of 2500 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters, food service equipment, and lighting fixtures. Demolition and installation of modified plumbing and electrical to support the renovated space.
08/18/2020 07:01 PM UTC
CP002591 - Ross Hall-First Floor Restrooms-Remodel
This project is the complete renovation of the first floor restrooms in Ross Hall to create accessible toilet facilities. The work consists of, but is not limited to, the replacement of toilets, sinks, partitions, door assemblies, ceilings, flooring, lighting, and power door operators.
08/13/2020 07:01 PM UTC
CP002592-Science Hall 2-First Floor Restrooms-Remodel
The project consists of, but is not limited to, replacement of sinks, toilets, partitions, and installation of power door operators to make the first floor restrooms in Science Hall II accessible.
08/06/2020 07:01 PM UTC
CP002466 - Utilities-Power Plant-Station Power Improvements-Phase 2
The project consists of, but is not limited to, installation of ridged steel conduit and high voltage cable bored from one existing underground electrical vault to another. Additional work includes the energization and testing of the high voltage cable and breaker.
07/02/2020 07:01 PM UTC
CP002656 - Memorial Union-Dining Services-Gelato Store
The project consists of, but is not limited to, renovation of 600 square foot food service venue located on the first floor of the Memorial Union. Scope includes installation of new counters & food service equipment. Finish upgrades to include new tile flooring, wall & ceiling finishes, and two new security grilles. Demolition and installation of new plumbing, mechanical, electrical, telecommunications, and fire protection to support the renovated space.
06/25/2020 07:01 PM UTC
CP002690-Armory-Interior Northwest Corner-Remodel
The project consists of, but is not limited to, finish updates; lighting, power, and mechanical system upgrades; and space reconfiguration.
06/23/2020 07:01 PM UTC
CP002671 - Utilities-Campus Sidewalk Lighting Improvements-Phase 1
The project consists of, but is not limited to, improving lighting on campus sidewalks by installing new poles and light fixtures, changing out HPS heads to an LED retrofit, and adding/replacing building mounted lights.
06/18/2020 07:01 PM UTC
CP002609 - Utilities-Power Plant-Natural Gas Main Valves Replacement
This project will replace the existing 12” natural gas valve with a new 8” header and three 6” valves and gas piping to each boiler to create redundancy and eliminate a single point of failure.
06/04/2020 07:01 PM UTC
CP002214 - BioCentury Research Farm-Vehicle Dynamometer Facility-Interior Remodeling
The project consists of, but is not limited to, providing transportation, equipment, materials, construction, and services necessary to remodel the interior of a pre-engineered steel farm building. Work will include steel wall liner, miscellaneous carpentry, mechanical, and electrical work.
05/28/2020 07:01 PM UTC