CP1275701-Durham Center-Room 0139-Remodel
This project will remodel a previously occupied computer lab space to include both open office space and private office spaces. This project includes, but is not limited to, new walls, flooring, paint, and furniture; additional mechanical equipment and controls for private offices; existing mechanical modifications; sprinkler modifications; and new lighting and lighting controls.
| 07/08/2025 07:01 PM UTC |
CP1281967-Dairy Farm-Barn Roof Truss-Repair
This project includes, but is not limited to, structural repairs of existing wood trusses at the Dairy Barn, DF-10, to plumb existing truss support posts to close gaps and install repairs. Repairs include removal of previous repair splices (approximately 30 locations), and installation of new 2 x 10 splices and additional knee bracing on all trusses. Repairs also include new chord bridging and new cross bracing, as shown on the drawings. Electrical conduit will need to be removed and reinstalled along the trusses as repairs are made. At two locations, sprinkler piping will need removed and reinstalled.
| 07/22/2025 07:01 PM UTC |
Number | Deadline |
---|---|
CP002618 - BioCentury Research Farm-North Parking Lot-Paving
The project consists of, but is not limited to, removal of the existing gravel and some of the compacted subgrade material from the existing north parking lot, placing the removed gravel to the proper elevation, and installing bioasphalt surface. Work also includes the removal of a small amount of a concrete sidewalk and installing a new concrete sidewalk.
| 10/17/2019 07:01 PM UTC |
CP002547 - Seed Science Building-Expansion
The project consists of, but is not limited to, a 1867sf expansion to the existing Seed Science Building at Iowa State University which will feature 4 new growth-rooms. The addition will be slab-on-grade and constructed of load-bearing concrete masonry units (CMU) with brick veneer and a steel framed roof.
| 10/03/2019 07:01 PM UTC |
CP002462 - Advanced Teaching & Research Building-5th Floor-Nanovaccine Institute
The project consists of, but is not limited to, new fit out space of a previously unoccupied upper floor of six-story research laboratory building. Spaces include research laboratories, associated faculty offices and support spaces. The existing structure consists of a cast-in-place concrete frame. Interiors include gypsum board on metal studs, acoustical ceiling tile, sealed concrete floors, and carpet tile. Mechanical, Piping, and Electrical systems are typical of a laboratory/office building.
| 09/05/2019 07:01 PM UTC |
CP002586 - Bessey Hall-Sprinkler Replacement
The project consists of, but is not limited to, replacing all sprinkler heads and minor piping modifications.
| 09/05/2019 07:01 PM UTC |
CP002585 - National Swine Research and Information Center-Sprinkler System Modifications
The project consists of, but is not limited to, replacing all standard response sprinkler heads with quick response sprinkler heads, upsizing the cross mains, and modifying the main service.
| 08/27/2019 07:01 PM UTC |
CP002551 - Lagomarcino Hall-Southwest Wing-Remodel
The project consists of, but is not limited to, space reconfiguration, new lighting, finish modernization, and minor HVAC modifications.
| 08/01/2019 07:01 PM UTC |
CP002440 - Utilities-Applied Science 1-Electrical Service Replacement
The project consists of, but is not limited to, installing a new secondary 480 volt electrical service from an exterior padmount City of Ames transformer to interior room in building basement, boring a 4” PVC conduit to overhead power pole, installing new service entrance main breaker switchboard, and refeeding the existing 1600A main-tie-main switchboard. Project also includes electrical grounding work, existing pipe demolition in basement mechanical room, new utility metering, transformer concrete pad installation, and provide new light fixtures.
| 08/01/2019 07:01 PM UTC |
CP002580 - Buchanan Residence Hall-Exterior Facade Repairs
The project consists of, but is not limited to, the removal and reuse of exterior metal wall panels, replacement of the panel support system, patch and repair or replace the air and water barrier, and supply and install new exterior metal wall panels where needed.
| 07/30/2019 07:01 PM UTC |
CP002540 - Veterinary Medicine-Field Services Building-Expansion
The project consists of, but is not limited to, the construction of a new building addition including foundations, building shell, interior finishes, doors, HVAC, and utilities on the north side of the existing Field Services Building. Also included is some interior renovation including restrooms.
| 07/25/2019 07:01 PM UTC |
CP002214 - Agricultural Engineering & Agronomy Farm-Vehicle Dynamometer Facility
The project consists of, but is not limited to, the construction of a new building including foundations, building shell, equipment pit, doors, electrical service entrance to house a vehicle dynamometer.
| 07/11/2019 07:01 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.